Low VOC content for treated wood products
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Matthew Perna on
Are preservative-treated and fire-treated wood products exempt from this credit since the treatment is done off-site?
statistics and consistency
posted by Susan Walter on
I think it would be very interesting to have statistics posted on credits. I know some of them from researchers and clients react well to them.
Furniture/systems furniture use in IEQc8.1
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Tiffany Moore on
I've been trying to find a confirming statement that either includes or excludes furniture/systems furniture from the daylight calculations of IEQc8.1, but have not been successful.
Documentation Costs?
posted by Ellen Mitchell on
While I think there is merit to many of the changes for 2012, I have an underlying concern about the usability of some of the credits.
Credit Specific Submittals
Pilot-Credits PC12:Reduced Automobile Dependenceposted by Tapio Peltonen on
This question applies to Project ID 1000019331 with Pilot Credit 12: Reduced Automobile Dependence. Option 1: Transit-Served Location requires a) A map with building entrance, bus stops and walking
EAp2 - CRAC Units DO NOT Comply!?
CI-2009 EAp2:Minimum Energy Performanceposted by Graeme Smith on
Hi All, My first post here...
Water feature pumps
CS-2009 EAc1:Optimize Energy Performanceposted by charles bell on
We are designing a dry water feature on a campus app guide project. The pumps will be on a limited schedule. How will the pumps be factored into the energy credit? thanks for your help
75%
EBOM-2009 MRc8:Solid Waste Management—Durable Goodsposted by American University on
We do a good job of tracking the tons of e-waste and furniture that we reuse or recycle, but we don't do a great job of separating the durable goods out of the waste stream to know the weight or am
Separate Heating and Cooling District Energy Systems
NC-2009 EAc3:Enhanced Commissioningposted by James Del Monaco on
Our project is located on a University campus with two separate DES buildings. One DES building houses all the chilled water equipment including chillers, pumps, cooling towers, etc.