Forum quick links
Materials Reuse-Clarification of credit implementation
NC-2009 MRc3:Materials Reuseposted by Elle Brown on
Can some one clarify if I'm understanding the implementation of this credit correctly? If material is salvaged onsite it must be used in a purpose other than for which it was intended (except for
LEED Boundary
posted by Nanechka Pagan on
The project consist of the construction of a new middle school and the remodelation of the existing elementary school both will shared some areas like the existing parking and the electric substati
Cutsheet Translation
CS-2009 WEp1:Water Use Reductionposted by Alessio Zampaglione on
Our project is In Italy and most of the cutsheets, certifications and declarations that we have are written in Italian and not in English.
Landfill Generated Methane Gas
NC-2009 EAc2:On-Site Renewable Energyposted by Kendal Neitzke on
Our building project is a methane pumping facility located at landfill that is the source of the methane.
Hot Melt Adhesives
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Bruce Maine on
I thought I knew the answer to this question but can't confirm. Are Hot Melt adhesives used in the application of laminates covered by the 80 g/L threshold? Thanks!
MRc7
CI-2009 MRc7:Certified Woodposted by Judy Chin on
Pyro-Guard Plywood (fired treated). How should i document this for MRc7? My co-worker says 100% for new wood & 0% for FSC, is this correct?
Combining Pathways
Pilot-Credits PC43:Certified Productsposted by Ben Tucker on
It is my understanding from the credit language that you can combine multipliers from the Certification pathway and the EPD pathway which is what we would like to do for our project.
Unsure if LEED form is behaving correctly
EBOM-2009 SSc6:Stormwater Quantity Controlposted by Johanna Ofner on
My project is pursuing Option 1, stormwater assessment report, of the Full documentation option of the O&M submittal path (what a mouthful!) of SSc6.
LEED NC vs. Healthcare
posted by Lisa Sawin on
Our project is mostly office space but houses a program for mental health.
Where do special review requirements come from?
posted by Hernando Miranda on
I have documented LEED projects since the dawn of time. Well, at least since the first certified NC v2 project that was not a special test case: Ford Premier Automotive Group NA vs.