Forum quick links
Super 8 Motel - comply with 10 units per acre
NC-2009 SSc2:Development Density and Community Connectivityposted by Thomas Boyd on
Can a super 8 motel be used as a residence documenting 10 units per acre if the operator is leasing rooms on month to month basis?
EPP certification for proof of recycled content?
NC-2009 MRc4:Recycled Contentposted by Renee Shirey on
Has anybody ever had an issue with using an EPP certified product to gain recycled content for a project?
Design Appeal and Construction Submittal
posted by J Morrison on
We had run into the issue that before we accepted the Design appeal we could not upload anything to our project site.
Exemplary Performance
NC-2009 MRc7:Certified Woodposted by J Morrison on
Have been having difficulty uploading documents for this credit. I called the 800 number and they said that they were having technical difficulties and to try again later.
Appeals
posted by J Morrison on
Is there a limit to the number of appeals? The cost is so much per credit on appeals if I understand correctly?
Cost info on LEED EBOM
posted by James Doyle on
For LEED EBOM cost info look at info in document from Environmental Defense Fund / edf.org titled Climate Corps Handbook Energy Efficiency Investment Opportunities in Commercial Buildings / FOURTH
Fluid Applied Air Barriers
Schools-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Nilo Regojo on
We are a General Contractor working on a school project and the specs require submittal of product data for the air barrier as part of IEQc4.2.
No new parking except for 3 LE/FE spaces
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Nelina Loiselle on
I'm working on a campus building where we have added only 6 new spaces (3 of which are ADA) I understand the ADA can be exempted, but since the other 3 new ones are being added to be reserved for L
Having Trouble Getting Compliance for EAp2
NC-2009 EAp2:Minimum Energy Performanceposted by Brian ORourke on
I am working on a LEED project and we hired an engineer to run an energy model on EQuest.
basement level with outdoor terrace for roof?
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Erica Downs on
We have basement level rooms that extend beyond the above-grade building footprint. Effectively, the terrace serves as the roof for these below-grade rooms.