Forum quick links
RE: Wellness Room in Office Building
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Chris Miller on
My office project has a "Wellness" room whcih includes a lav faucet & toilet.
Adjunct Professors Room
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Saju Varghese on
Hi, In one of our project we have a room designated for 6 adjunct professors to work/study/rest.
Wood Flooring
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Mariah Grife on
I am on aproject that is installing some savage wood flooring panels that were removed and saved during demo.
Case 1 Central Plant Cooling
CI-2009 EAc3:Measurement and Verificationposted by sompoche sirichote on
Under Case 1, we got comments from the reviewer as follows: "Case 1 - Lease The LEED Credit Form has been provided stating that the project occupies 1.2% of the base building and therefore applies
M&V option D. certification timing
NC-2009 EAc5:Measurement and Verificationposted by Alex Parella on
When using Option D, should we wait till the end of the 1 year monitoring to obtain the credit and, therefore, the final building certification?
2 questions...
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Courtney Royal on
First, on the credit form, even tho flooring such as tile, terrazzo, stone, do not require any IAQ testing, etc., do you still need to enter them on the credit form?
Extraction/Manufacture within 500 miles
NC-2009 MRc5:Regional Materialsposted by Mariah Grife on
I have a letter from the supplier for Timber that it is both manufactured and extracted within 500 miles, but does not list a specific location or zip code.
ID Credit for Occupant Wellness
NC-2009 IDc1:Innovation in Designposted by Sara Zoumbaris on
Hi All!
Daylight simulation high rise office building - CS 2.0
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Olivier Brouard on
Dear forum, I hope the following help request is falling under the right LEED version, since the calculations I am running are following the guidelines of CS2.0 as the design studies of the buildi
Ventilation By Exhaust air make-up
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Chinthaka Jagodaarachchi on
We working on a industrial building where there is an unconditioned dining area for factory workers. This dining area is provided with roof mounted exhaust fans.