Elevation of the 100-year flood - FEMA/FIRM maps not available
NC-2009 SSc1:Site Selectionposted by Jennifer Martin on
There are no 100-year floodplain maps for Scotland County (project location) on file with the Scotland County Assessor, the USDA, the US Farm Service Agency or the Missouri State Emergency Manageme
Preferred Parking Exceeds 5% of FTE
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Denise Shimabukuro on
I have a building with 21 FTE. Since 5% of FTE translates to 2 (1.05 rounded up)parking stalls, can they both be preferred (1 for carpool and 1 for LEV)?
Summary 90.1 - Naturally Ventilated with Radiant Floor Heat
NC-2009 EAp2:Minimum Energy Performanceposted by Jean Marais on
I'm preparing a summary for the LEED reviewers regarding a model and would like your thoughts: 1.1 Introduction: A naturally ventilated building with radiant floor heating has some definite nuance
Warehouse HVAC for Baseline
NC-2009 EAp2:Minimum Energy Performanceposted by Marina Andrade on
Hi! I am working on simulation of a warehouse where my proposed project has natural ventilation.
Fan power credit and packaged vav
NC-2009 EAp2:Minimum Energy Performanceposted by HOUCINE TLEMSANI on
I am working on a project where the base line system is a packaged VAV with reheat. ASHRAE 90.1 specify the packaged efficiency as 9.8 EER including the compressor heat rejection and fans.
HVAC system - Proposed model - Part of system provided
NC-2009 EAp2:Minimum Energy Performanceposted by Luana Bertoletti on
Hi, I have a doubt related to how to model the proposed system when only part of the system is provided for some areas. In a specific project, most of the areas have the HVAC system already desig
wood with recycled content
NC-2009 MRc7:Certified Woodposted by Benjie Herrera on
If the wood purchased has 20%recycled content (which will go to MR Cr4 Recycled Content), will that mean that 80% non-recycled content of the value must be reported in the MR cr 7 Certified Wood ?
Pilot Credit vs EAc5
Pilot-Credits PC27:Reconcile Designed and Actual Energy Performanceposted by Sara Goenner Curlee on
I am working on a LEED NCv2.2 academic building which has completed its EAc5 Measurement and Verification effort. I am trying to understand how EAc5 and the pilot credit differ.
Metro Stations/Netwrok- LEED Rating
posted by Rohit Jagnani on
There is a Rapid Metro network in construction with multiple stations and the rail network in between. The entire network( Rail line and stations) is elevated and above the existing roads.