Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Innovative water efficiency

EBOM-2009 IOc1:Innovation in Operations
posted by  Melissa Merryweather  on 

A project considering LEED EBOM is looking to add a new rainwater catchment system because it will be lower-cost then replacing old sanitary ware.

1
Thu Mar 24, 2011, 11:58 am

Multi-parameter alternative product analysis

Pilot-Credits PC2:PBT Source Reduction: Dioxins and Halogenated Organic Compounds
posted by  Jeff Gearhart  on 

We are pursuing this credit for a CI project. Interested in any further guidance on "multi-parameter alternative product analysis".

1
Fri Apr 1, 2011, 7:18 pm

Guadua

NC-2009 MRc6:Rapidly Renewable Materials
posted by  Carlos Alberto Hoyos Soto  on 

I want to know if anyone has use guadua, and if it is considered as rapidly renewable material, thanks.

1
Thu Mar 24, 2011, 3:30 pm

DES Commissioning

NC-2009 EAc3:Enhanced Commissioning
posted by  Margaret Montgomery  on 

We're looking at a project where we do meet all the conditions for enhanced commissioning that would indicate we need to commission the district energy plant (third party, local CHP plant), but we'

1
Tue Apr 26, 2011, 12:37 pm

Maximum Points Available

EBOM-2009 EAc1:Optimize Energy Performance
posted by  David Hubka  on 

The LEED O&M reference guide states that two points are available under EA Credit #1 for projects that follow Case 2 Option 2A however the LEED online template does not award credits under this

1
Fri Mar 25, 2011, 6:14 pm

LEED Online Language

CI-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Simon Sue  on 

The credit intent and application is very clear as stated above: "Private offices and open space offices need multiple controls for 50% of occupants.

1
Tue Mar 29, 2011, 5:29 pm
1
Fri Apr 1, 2011, 10:13 pm

Applying both Case 1 and Case 2 to our site?

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Shannon Terrell  on 

We have a site that is partially a greenfield and partially previously developed (remediated brownfield).

1
Fri Mar 25, 2011, 9:44 pm

Please Clarify

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Aliesa Adelman  on 

Two different bus lines simply refers to two buses on different routes from the same carrier, correct? Or does the credit require two separate carriers servicing stops 1/4 mi. from the project?

1
Fri Mar 25, 2011, 8:03 pm

South America weather data

NC-2009 EAc1:Optimize Energy Performance
posted by  Carlos Alberto Hoyos Soto  on 

Anyone knows what energy modeling software has developed South America weather data?

1
Tue Apr 5, 2011, 2:01 pm