Section 1.4: Mechanical System Design CriteriaCI-2009 EAc1.3: Optimize energy performance - HVACposted by Nick Chiarelli on Jun 3, 2013, 12:18 pm
If I could get some clarification on this section it would be a huge help! Total project space load (heating and cooling): Is this the sum of all seperate max space loads or is this the... |
|
Partial Load Calculations & Fan SizingCI-2009 EAc1.3: Optimize energy performance - HVACposted by Nick Chiarelli on May 8, 2013, 6:35 am
Hello, This project is 12 floors served by... Last reply: Dylan Connelly, May 9, 2013, 9:29 am |
|
EAc1.3 Simulation for LEED CICI-2009 EAc1.3: Optimize energy performance - HVACposted by Jimena Etchegaray on Apr 29, 2013, 5:24 pm
HELLO. Last reply: Marcus Sheffer, Apr 30, 2013, 10:00 am |
|
Gas Rooftop HVACCI-2009 EAc1.3: Optimize energy performance - HVACposted by Kasandra Martin on Mar 12, 2013, 2:38 pm
Are there any guidelines with LEED CI for having gas fired rooftop hvac units? Last reply: Tristan Roberts, Mar 26, 2013, 10:31 am |
|
Do we need to document out of scope HVAC equipment?CI-2009 EAc1.3: Optimize energy performance - HVACposted by Silvia Ruiz on Feb 26, 2013, 1:04 pm
I am working on a project where all of the AHUs, except for one, are provided by the building owner. Thus, the scope of work is limited to the provision of one... Last reply: Dan LeBlanc, Mar 25, 2013, 6:54 pm |
|
CAV- How to meet section 3.1 requirementCI-2009 EAc1.3: Optimize energy performance - HVACposted by Srimannarayana NCVK on Mar 13, 2013, 12:23 pm
Hi, For one of my LEED CI project, air distribution is a CAV system. There is a... Last reply: Rudolph Carneiro, Mar 21, 2013, 1:39 pm |
|
Part-load condition calculations using HAPCI-2009 EAc1.3: Optimize energy performance - HVACposted by LarsonBinkley Employees on Sep 17, 2010, 3:36 pm
I am working on a small office space. I am trying to get 5 points for equipment efficiency. CPG section 1.4 indicates to provide calculations for part-load condition. It is not clear to me what... Last reply: Rudolph Carneiro, Mar 19, 2013, 4:36 pm |
|
Option 2- The Performance Rating MethodCI-2009 EAc1.3: Optimize energy performance - HVACposted by Emma Eliasson on May 31, 2012, 8:53 am
Hi, LEED Reference Guide For Green Interior Design And Construction says in chapter EAc1.3 (# 6. Calculations) on p.168 that the standard has 2 energy comparison methods, both of which are... Last reply: Paula Hernandez, Mar 19, 2013, 1:56 pm |
|
LEED CI for Data center projectCI-2009 EAc1.3: Optimize energy performance - HVACposted by Lavanya Veerappa on Feb 11, 2013, 4:52 am
Hi, A data centre project that i am working for is applying for LEED CI. We are planning to work on option 1 - prescriptive approach to meet enhanced energy performance. We have... Last reply: Amy Boyce, Mar 8, 2013, 10:05 am |
|
Active control modulating the HVAC system as per space demandCI-2009 EAc1.3: Optimize energy performance - HVACposted by Lavanya Veerappa on Feb 12, 2013, 4:51 am
Does that mean a dedicated... Last reply: Marcus Sheffer, Feb 18, 2013, 9:42 am |