Forum quick links
VOC emissions evaluation Option 1 vs Option 2
NC-v4.1 EQc2:Low-Emitting Materialsposted by Erin Holdenried on
In the credit calculator, under the Low-emitting criteria column (for Flooring, Wall panels, Ceilings, and Insulation) the drop down box has options for VOC emissions evaluation Option 1 or&nb
Project site part of a newly masterplanned area
NC-v4 LTc3:High priority siteposted by Nermin Hegazy on
Hello!
Naturally Ventilated Spaces-Exhaust Airflow measurement Devices and CO2 Measurements
NC-v4.1 EQp1:Minimum Indoor Air Quality Performanceposted by Ayman Raouf on
I am curious to know why mechanically ventilated spaces do not require using direct exhaust airflow measurement devices whereas naturally ventilated spaces do.
Measuring Strategies for VAV and Constant Volume Systems
NC-v4.1 EQp1:Minimum Indoor Air Quality Performanceposted by Ayman Raouf on
I noticed that the monitoring for Constant Volume Systems differ from the VAV systems.
Fine or bulky material
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
In order to specify the lighting power density according to table 9.6.1, what is the definition of "Fine material storage"?
Report from the October Integrated Solutions Jams
posted by Nadav Malin on
Hi Leaders,
Innovation Credits Documentation
NC-v4 INc1:Innovationposted by on
May be a dumb question -- but how do I go about documenting innovation credits? In the innovation form it asks us to list the credit then provide documentation of it.
Tenant services and submetering
CS-v4 WEc4:Water meteringposted by Clara Sosa D´Este on
Hi everyone, we are working on a shopping mall and we wanted to know, in the case that a tenant of the project is going to build bathrooms and kitchens for their particular business, if we have to
Tenant contracts their own electrical power
CS-v4 EAp3:Building-level energy meteringposted by Clara Sosa D´Este on
Hi everyone, we wanted to know if, in the case a tenant contracts their own electrical power for their space, if we have to meter that line as well or if we have to meter only the base building pow