Forum quick links
LEED V.4 and LEED AP Exams
posted by Hasitha Herath on
i heard that LEED V.4 is on the way. i am planning to take LEED AP (BD+C) exams in end of September? since LEED V4 is coming will there be changes to the scope of the exam?
LEED Online Form for MR Cr. 4 used V 3 to convert to V 4
NC-2009 MRc4:Recycled Contentposted by Benjie Herrera on
The LEED online V3 form of MR Cr 4 requires to type item by item sustainable materials on the form while V4 form requires only to upload material calculator worksheet and then type the total cost
Line of Sight from Workstations
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Andrew Ellsworth on
I have two questions that may seem nitpicky, but are relevant to achieving this credit.
green house and daylighti credit
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Oleg Petryuchenko on
We have large warehouse project that also has a green house as a part of the building. could this area be excluded from daylighting?
All Interior finishes qualify based on IEQ 4.1-4.4, still pursue
Pilot-Credits EQpc21:Low-emitting interiorsposted by Trinidee Shelton on
If all interior finishes we have meet the requirements of IEQ 4.1-4.4, is it still possible to pursue this credit as well? Is it advisable in order to compare the two methods of review?
University Campus Buildings Connected
posted by Lara Branco on
Hello, I'm having some difficulty in figuring out if my project should be certified as one single building, or different building (and certifications) on a campus. The project is of an university
Existing 1MW PV Array feeding new LEED Project on Campus
NC-2009 EAc2:On-Site Renewable Energyposted by Greg Kight on
My project is a LEED v2.2 NC 32,000 sf project going for an 'individual' certification on a campus of existing buildings (None others are certfied or pursuing certification).
VAV minimum for Ds
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by George Kotsis on
Hello All: Is there any specific requirement from LEED for what the VAV minimum should be during cooling or heating?
Major Renovations Project
NC-2009 SSc1:Site Selectionposted by VICTOR MORENO on
Hi, I am performing a Major Renovation Project that footprint building is equal to Project area site.
EA Cre 4_LEEDonline form
CS-2009 EAc4:Enhanced Refrigerant Managementposted by Adam Targowski on
This credit is listed in Appendix 4 under case C so it should include tenant spaces as well. I have a question regarding filling in the LEEDonline form.