Topic | Recent |
---|---|
eligibility for projects with no HVAC in scopeCI-2009 EAc1.3: Optimize energy performance - HVACposted by Victoria Lockhart on Sep 28, 2010, 11:39 am
in the summary at the top of this page it states: Do project teams not have... Last reply: Christine Beaton, Mar 16, 2011, 11:03 am |
|
Savings calculationsCI-2009 EAc1.3: Optimize energy performance - HVACposted by Sundararaj Subburaman on Feb 9, 2011, 2:04 am
Our client is occupying the 8th floor of a G+8 building. The central plant is a combination of Air cooled and water cooled chillers. The conditioned area of the project area alone is 45,000 sqft... Last reply: Sundararaj Subburaman, Mar 4, 2011, 11:57 pm |
|
Option 1CI-2009 EAc1.3: Optimize energy performance - HVACposted by Azita Mousavi on Jan 26, 2011, 5:38 pm
I'm working on an existing Building. the original building has its gold certificate CS and all main... Last reply: Paul Conrad, Feb 2, 2011, 1:45 pm |
|
thermostat = space sensing occupancy?CI-2009 EAc1.3: Optimize energy performance - HVACposted by Derek Fung on Dec 15, 2010, 4:08 am
EA 1.3 Option B. I have gotten inconsistent reviews over separate projects on thermostat controlled... Last reply: Paul Conrad, Dec 15, 2010, 8:45 am |
|
Treatment of DES for LEED-CI 2009CI-2009 EAc1.3: Optimize energy performance - HVACposted by Evelyn Dicks, EI, CxA on Dec 9, 2010, 11:33 am
I am working on a project to build-out the 2nd floor of a 2-story law school building, approximately 9,000 square feet for each floor. The building's HVAC systems are served by a central heating... Last reply: Evelyn Dicks, EI, CxA, Dec 9, 2010, 1:26 pm |
|
EAc1.3 and onsite renewablesCI-2009 EAc1.3: Optimize energy performance - HVACposted by Shannon Allison on Dec 2, 2010, 1:27 pm
Can we take credit for PVs? If so, how do you include the savings? If we include the PVs in our energy model, the savings is deducted from the total building end use. The LEED template table... Last reply: Paul Conrad, Dec 8, 2010, 10:14 am |
|
Energy Simulation for CICI-2009 EAc1.3: Optimize energy performance - HVACposted by Santhosh Manavalan on Nov 30, 2010, 4:21 am
My client is hiring only a small portion of the existing building, which is not LEED certified, and we are using the common central chiller of that building, but we have our own... Last reply: Paul Conrad, Dec 8, 2010, 10:07 am |
|
description of the potential savingsCI-2009 EAc1.3: Optimize energy performance - HVACposted by Jacob Goodman on Oct 19, 2010, 10:34 am
I recently recieved a review comment asking to expand the narritive of EAc1.3 Opt. 1 to include "description of the potential savings" as requested on the credit template. I am attempting only... Last reply: Paul Conrad, Nov 12, 2010, 8:53 am |
|
Option 2- Server coolingCI-2009 EAc1.3: Optimize energy performance - HVACposted by Christian Brücher on Nov 8, 2010, 9:26 am
In our CI-project (2 floors of office space) we want to go for option 2. But we are not sure if we have to include the installed load for cooling the server room into the the total tenant space... Last reply: Paul Conrad, Nov 8, 2010, 10:36 am |
|
Option 1 Equipment Efficiency- more questionsCI-2009 EAc1.3: Optimize energy performance - HVACposted by Nancy Henderson on Nov 4, 2010, 6:03 pm
We have two project pursuing the prescriptive option and each one has issues: 1. A tenant is taking all of an existing buildng and adding a VRF system to supplement the existing system (... Last reply: Paul Conrad, Nov 8, 2010, 10:34 am |