Forum » CI-2009 EAc1.3
Topic

accounting for equipment not listed in CPG tables

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Keith Amann on Oct 24, 2012, 12:12 pm

The Core Performance Guide, and it's reference standard (Consortium for Energy Efficiency Commercial Unitary AC and HP Specification) has no standard for large (760 kbtu/h) systems. Table 2.9.2...

Last reply: Marcus Sheffer, Oct 25, 2012, 9:47 am

Mechanical Efficiency Requirements- Energy Star

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Noriko Nagazumi on Sep 24, 2012, 12:52 am

Hi,

The Advanced Buildings Core Performance Guides asks for ENERGY STAR labeled package unitary equipment.

Does anyone has experience with ENERGY STAR "equivalent" equipment...

Last reply: Scott Adams, Sep 24, 2012, 12:54 pm

Equipment Efficiency Section 1.4

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by John Kitsalis on Sep 18, 2012, 11:31 am

This section is a little confusing and I am putting my interpretation of it up. Please let me know if I am correct.

Total Project Space Load (heating/cooling):
I did load...

Last reply: Dylan Connelly, Sep 19, 2012, 11:35 am

Baseline System parameters with a DES

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Luke Knapp on Jul 31, 2012, 12:18 pm

I'm designing a building on a college campus that has a...

Last reply: Marcus Sheffer, Jul 31, 2012, 1:58 pm

Project Area

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Dominique Arrieta on Jul 6, 2012, 5:21 pm

Hello, we have recently realized that our project gross area was one number, and the energy model done by our engineer did not include an atrium space in the middle of the project (project is on...

Last reply: Dan LeBlanc, Jul 10, 2012, 12:37 pm

Detailed Plant Simulation

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Chilufya Lombe on May 20, 2012, 5:39 am

Hi, we have a project with a certain number of 'back up' systems for air conditioning. The main system is a geothermal ground loop but there is an air cooled chiller that will be installed as...

Last reply: Dan LeBlanc, Jul 3, 2012, 2:37 pm

Modeling of Retail Refrigeration System for LEED Retail CI

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Dana Villeneuve on Jun 6, 2012, 7:33 pm

I'm working on a retail (grocery store) project which is pursuing LEED for Retail CI, and my question is, simply put: are we supposed to only model HVAC for EAc1.3 or can we include Refrigeration...

Last reply: Dan LeBlanc, Jun 22, 2012, 1:39 pm

VAV system required for small DX?

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Daniel Thien on Dec 21, 2011, 11:49 am

I am researching option 1 for Advanced building requirements. We are working in a 1 story industrial park and are installing new 10 ton and below DX RTUs. We are meeting all the efficiency...

Last reply: Elizabeth Powers, May 15, 2012, 6:04 pm

exhaust fans in lieu of VAVs?

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by rob moylan on Mar 29, 2012, 2:18 pm

We have 4 person meeting rooms that are typically used for less than an hour at a time, yet during our...

Last reply: Erik Dyrr, Apr 9, 2012, 2:05 pm

Option 2/ Path 2- Square Footage

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Dominique Arrieta on Mar 29, 2012, 10:05 am

Our engineer used the net SF for this calculation instead of the gross SF which matches the PI forms. I know this will be a red flag, but does anyone know if this will be acceptable? Will he have...

Last reply: Marcus Sheffer, Mar 29, 2012, 10:31 am