Topic | Recent |
---|---|
Projects outside the U.S.EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Stefanie Hoffmann on Jun 3, 2013, 5:06 am
Dear all, Last reply: María Fernanda Aguirre, Jun 20, 2013, 9:26 pm |
|
CHANGING FIXTURES TO MEET PREREQUISITEEBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Daniel Rohe on May 8, 2013, 9:18 am
I have a building that was built before 1993 with airators that are 2.2. Inorder to meet the prequisite I have to change the Airators to .5. Can I just go ahead and change them out and then... Last reply: Trista Brown, May 8, 2013, 9:54 am |
|
MULTIPLE BUILDINGS CONNECTED AS ONE.EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Daniel Rohe on Apr 18, 2013, 7:52 am
I am trying to put together a water fixture inventory and calculations for an office complex that has three buildings built in different years that are attached as one building. The first... Last reply: Michael Smithing, Apr 18, 2013, 8:19 am |
|
Sinks in medical offices?EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by American University on Mar 25, 2013, 1:12 pm
We're trying to certify a building on our campus that contains the student health center. Each of the exam rooms has a sink in it for the doctor to wash hands before/after the exam. Do we need to... Last reply: Susan Walter, Mar 25, 2013, 3:24 pm |
|
WEp1 Form- lav duration and "all fixtures installed > 1/1/94"EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Lyle Axelarris on Feb 20, 2013, 5:57 pm
I have two questions about the LEED Online WEp1 form: 1. Table 3a on page 87 of the Reference Guide (updated 4/2010) shows a default lavatory faucet duration of 15 seconds, but Table WEp1... Last reply: Michael Smithing, Feb 22, 2013, 2:55 am |
|
Flush & Flow Fixture InstallationsEBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Alexis Voeltner on Feb 20, 2013, 1:54 pm
If our potential project is currently installing flush & flow fixtures, but wants to start the performance period, is it acceptable to enter the new flush & flow rates as long as they are... Last reply: Michael Smithing, Feb 21, 2013, 11:39 am |
|
LEED 2009 O+M WE-P1EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Bruce Albright on Jan 10, 2013, 11:30 am
We can use some guidance on revising our submittal template to meet the reviewers clarification request. Under the Reduced Occupancy Guidance for LEED the reviewer is asking that we adjust our... Last reply: Bruce Albright, Jan 30, 2013, 8:05 am |
|
Baseline for plumbing upgradesEBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Jessica Hawley on Apr 3, 2012, 3:18 pm
Please help me figure this out... We're working with a building built in the 80's, all original plumbing and fixtures. They registered with LEED, then performed a complete renovation (... Last reply: Katherine Ann Resurreccion, Dec 5, 2012, 10:10 pm |
|
Flow rate for Kitchen SinkEBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by ABHIJIT PISAL on Nov 13, 2012, 6:39 am
I just want to understand at what pressure is flow rate of kitchen sink (2.2 GPM) defined Last reply: Tristan Roberts, Nov 23, 2012, 10:59 am |
|
Baseline Water Use FormulaEBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Tara Bennett on Sep 21, 2012, 5:37 pm
I'm looking for the actual formula/equations used for the calculations that are done automatically on the WEp1 active form. I thought I could work through it logically, but my numbers are not... Last reply: Lawrence Lile, Oct 25, 2012, 4:33 pm |