100' Wetland - previously developed
NC-2009 SSc1:Site Selectionposted by Kris Phillips on
The credit requirements excuse "previously developed" sites for 1) the 100-year floodplain and 2) within 50' of a water body. This is not specifically mentioned 3) within 100' of wetlands.
Mechanical equipment compartments as roof surface
CS-2009 SSc7.2:Heat Island Effect—Roofposted by Alessio Zampaglione on
Hi everyone, I’m working on a project registered under LEED 2009 C&S Rating System.
Vinegar Cleaner
EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materialsposted by Erin Nuckols on
Our custodial team uses White and Apple Cider Vinegar Cleaner as a part of their cleaning procedure.
Commissioning and CO
posted by Paulina Marinkovic on
Can a certificate of occupancy be obtained without building commissioning in New York State?
Capitol Cost ECMs
EBOM-2009 EAc2.2:Existing Building Commissioning—Implementationposted by Robert Calloway on
When submitting the reports for a LEED RCx project, one of the reports is for Capital Cost Energy Conservation Measures.
Leed Rating system - multiple buildings
posted by Kevin Perry on
Hello, We are working on a project for a privately funded college on a single site, in existing multiple buildings.
Calibration report
EBOM-2009 WEc1:Water Performance Measurementposted by Patricia Fuertes on
We are pursuing this credit but meters in Spain are not calibrated nevermore once they are installed. When they are revised they are substituted if needed or every 4 years for example.
Materials and Resource Calculator
NC-2009 MRc7:Certified Woodposted by Emmanuel Pauwels on
When trying to complete the Template, it says "Download, complete and upload the Materials and Resource Calculator (found under "Credit Resources") to document sustainable criteria values for MR Cr
Overground parking structure
NC-2009 IEQp1:Minimum IAQ Performanceposted by Maya Karkour on
Hello, I am working on a project (very big retail rectangular mall) which has an overground parking building (4 stories above ground) attached to it from one side.
Underground Parking - Site Size
CS-2009 SSc7.1:Heat Island Effect—Nonroofposted by PAULA HIDALGO on
What happens if I have a building whose footprint is considerably smaller in comparison to the site size and I have 100% of the parking sites underground, can I achieve the credit no matter the SRI