Baseline System 2NC-2009 EAc1: Optimize Energy Performanceposted by SSN Energy Model on Apr 16, 2017, 2:02 am
As per Table 6.8.1D, I observed the following Last reply: Marcus Sheffer, Apr 21, 2017, 10:48 am |
|
ASHRAE 90.1-2007 article G3.1.1 exception (a)NC-2009 EAc1: Optimize Energy Performanceposted by Ann-Judith Belanger on Mar 24, 2017, 8:53 am
Hi everyone, I have a question regarding the reference's HVAC heating energy source for my projet. Here's the general outline: Last reply: Ann-Judith Belanger, Mar 27, 2017, 8:59 am |
|
Leed 2009 NC-District cooling path oneNC-2009 EAc1: Optimize Energy Performanceposted by Mark JIN on Mar 20, 2017, 10:53 pm
Dear Friends, I have a project located at Dubai where a localized existing district cooling plant will be providing chilled water. However the DCP supplier is not willing to share any... Last reply: Marcus Sheffer, Mar 24, 2017, 9:48 am |
|
Energy modeling for an industrial facilityNC-2009 EAc1: Optimize Energy Performanceposted by Mohamed M. Abd Elhameed on Mar 20, 2017, 9:33 am
I am working on an energy model for a Factory that was registered under LEED v3. The factory has no HVAC system except for some ventilation fans. Also, the major sum of the energy consumed by the... Last reply: Marcus Sheffer, Mar 20, 2017, 10:03 am |
|
Energy modeling for an industrial facilityNC-2009 EAc1: Optimize Energy Performanceposted by Mohamed M. Abd Elhameed on Mar 20, 2017, 9:36 am
I am working on an energy model for a Factory that was registered under LEED v3. The factory has no HVAC system except for some ventilation fans. Also, the major sum of the energy consumed by the... |
|
Energy modeling for an industrial facilityNC-2009 EAc1: Optimize Energy Performanceposted by Mohamed M. Abd Elhameed on Mar 20, 2017, 9:35 am
I am working on an energy model for a Factory that was registered under LEED v3. The factory has no HVAC system except for some ventilation fans. Also, the major sum of the energy consumed by the... |
|
Energy modeling for an industrial facilityNC-2009 EAc1: Optimize Energy Performanceposted by Mohamed M. Abd Elhameed on Mar 20, 2017, 9:34 am
I am working on an energy model for a Factory that was registered under LEED v3. The factory has no HVAC system except for some ventilation fans. Also, the major sum of the energy consumed by the... |
|
SS- EMNC-2009 EAc1: Optimize Energy Performanceposted by SSN Energy Model on Feb 19, 2017, 10:19 am
Dear All, I am doing Energy Model for Shopping Mall Project. Currently, I am working for Proposed Case. As per the design, the proposed system is 10 no of VRF with COP 3.8. VRF has... Last reply: Marcus Sheffer, Feb 19, 2017, 12:24 pm |
|
Utility RateNC-2009 EAc1: Optimize Energy Performanceposted by Alice chen on Jan 19, 2017, 6:05 am
Hi All, I am working on a LEED 2009 project based in Europe. I just wonder shall I use the latest utility rate in 2016 or the old one in 2010? Shall I put Dollars or Euro in the model?... Last reply: Marcus Sheffer, Jan 19, 2017, 9:21 am |
|
Proposed case cooling capacity reducing energy savingsNC-2009 EAc1: Optimize Energy Performanceposted by SSN Energy Model on Jan 19, 2017, 5:35 am
Hi, I am doing energy simulation for G+4 Labor Accommodation building. In base case, i have considered 2.66 COP. Auto sized as per ASHRAE. In proposed case, VRF System used with... Last reply: Marcus Sheffer, Jan 19, 2017, 9:11 am |