Baseline HVAC type

NC-2009 EAp2: Minimum Energy Performance
posted by TOMAS URIBE on May 13, 2014, 3:45 pm

Hello Marcus.

We have a healt care building and I would like to know if my baseline HVAC model approach is correct.

The building has 12 floors. So it will classified as system 7 (...

Last reply: Marcus Sheffer, May 14, 2014, 9:48 am

district heat pumps

NC-2009 EAp2: Minimum Energy Performance
posted by Francesco Passerini on May 6, 2014, 6:36 am

Two buildings (“building A” and “building B”) are on adjacent sites. The project team wants to achieve two different LEED NC certifications. The buildings are heated by the same geothermal heat...

Last reply: Francesco Passerini, May 7, 2014, 5:57 pm

Process outside buildings

NC-2009 EAp2: Minimum Energy Performance
posted by LEED Pro Consultant on May 6, 2014, 12:53 pm

Hello,

Regarding a campus project: We have several buildings (11 small ones) within one campus and several processes going on within the campus, but outside of any building. Some of these...

Last reply: Marcus Sheffer, May 7, 2014, 10:34 am

Baseline Model DCV

NC-2009 EAp2: Minimum Energy Performance
posted by Laura Long on May 6, 2014, 9:22 am

I overlooked the demand control requirement for the baseline system in the energy model, and have been directed by the reviewer to install it in 3 rooms based on calculation numbers, which makes...

Last reply: Laura Long, May 6, 2014, 10:37 am

Table EAp2-5

NC-2009 EAp2: Minimum Energy Performance
posted by Isabel Santos on May 5, 2014, 12:41 pm

Dear all,

I am having one difficulty in filling the form of EAp2. The “Total Energy Use” of the proposed design is dividing the sum of the values per 100, resulting in an error message and...

Last reply: Marcus Sheffer, May 5, 2014, 1:04 pm

Process Loads in LEEDOnline Form

NC-2009 EAp2: Minimum Energy Performance
posted by Omar Elrawy on May 4, 2014, 2:15 pm

Dear all,
I need to know if anyone did experience that before. My process loads exceeds the 25% though; on the scorecard EAp2 the process load compliance is (N), I tried...

Last reply: Marcus Sheffer, May 5, 2014, 11:10 am

USGBC Approved Standard for International Projects

NC-2009 EAp2: Minimum Energy Performance
posted by Maya Karkour on May 2, 2014, 4:07 am

Dear All,

As part of the Alternative Compliance Path, "Projects outside the U.S. may use an alternative standard to ANSI/ASHRAE/IESNA Standard 90.1-2007 if it is approved by USGBC as an...

Last reply: Marcus Sheffer, May 2, 2014, 10:02 am

Modelling Basement Parking

NC-2009 EAp2: Minimum Energy Performance
posted by Omar Elrawy on Jun 19, 2013, 10:58 am

I'am modelling a building with 2 levels of underground parking, which is unconditioned, opened to the outdoor, and having 4 fans (2 supply and 2 exhaust), while the exhaust fans are DCV's based...

Last reply: Marcus Sheffer, Apr 30, 2014, 9:37 am

Modeling District Steam in Baseline

NC-2009 EAp2: Minimum Energy Performance
posted by Nicholas Young on Apr 28, 2014, 2:22 pm

We are looking at an existing 300,000 s.f. hotel highrise in a downtown location that is currently on a citywide district steam utility. There are extensive interior architectural changes and a...

Last reply: Christopher Schaffner, Apr 28, 2014, 2:51 pm

Reuse of process equipment

NC-2009 EAp2: Minimum Energy Performance
posted by LEED Pro Consultant on Apr 25, 2014, 8:12 pm

Hello everyone,

We are working on an industrial facility project, in this case the process loads represent a 60-70% aprox.

The intent of the client is to bring equipment from...

Last reply: Marcus Sheffer, Apr 25, 2014, 8:18 pm