No autosizing of equipment on proposed?NC-2009 EAp2: Minimum Energy Performanceposted by Saju Varghese on Oct 15, 2014, 4:30 pmat different flow rates, then the answere is beyond the scope of this forum (hint: the flow impacts on the hydronic pressure that the fan must overcome in the system and directly impacts the power...check out your software's user forum). Log in or register to post comments Marcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5903 thumbs up October 20, 2014- 7:13 am Appendix G requires... Last reply: Marcus Sheffer, Oct 20, 2014, 7:13 am |
|
On-site renewable energyNC-2009 EAp2: Minimum Energy Performanceposted by Lise Dannesboe on Oct 15, 2014, 4:34 am
Hi! Last reply: Lise Dannesboe, Oct 17, 2014, 1:40 am |
|
exceptions and alternative options for vestibulesNC-2009 EAp2: Minimum Energy Performanceposted by Francesco Passerini on Oct 14, 2014, 11:00 am
According to 5.4.3.4 (mandatory provision) enclosed vestibules shall protect building entrances that separate the conditioned space from the exterior. In the building that I’m considering, a... Last reply: Marcus Sheffer, Oct 14, 2014, 8:39 pm |
|
External Lightning ExceptionsNC-2009 EAp2: Minimum Energy Performanceposted by Marina Andrade on Oct 14, 2014, 6:30 am
Hi everyone, It is necessary to prove the power... Last reply: Marina Andrade, Oct 14, 2014, 8:54 am |
|
Baseline systems- heating onlyNC-2009 EAp2: Minimum Energy Performanceposted by Vassil Vassilev on Oct 1, 2014, 8:42 am
The project I'm working on currently is for a production plant and office zones all in one building. There is no cooling coils in all designed system with the exception of the Dx unit in the... Last reply: Marcus Sheffer, Oct 14, 2014, 8:00 am |
|
Equipment Capacity for Design and Baseline CaseNC-2009 EAp2: Minimum Energy Performanceposted by April Brown on Sep 18, 2014, 12:29 pm
Hi Marcus et al., I received a question from one of our project energy modelers that I cannot answer - Recently we have been receiving a new comment on EAp2 that states Last reply: Marcus Sheffer, Oct 13, 2014, 8:32 pm |
|
Time Setpoint No Met & Setback TemperaturesNC-2009 EAp2: Minimum Energy Performanceposted by Marina Andrade on Oct 13, 2014, 9:52 am
Hi everyone! I've some doubts about this points. Whats is the setback temperatures? The time setpoint not met is calculated only in the occupied hours? I ask this because the air... Last reply: Marina Andrade, Oct 13, 2014, 1:09 pm |
|
Multi-purpose unit for 4-pipe systemsNC-2009 EAp2: Minimum Energy Performanceposted by Francesco Passerini on Oct 10, 2014, 11:30 am
I'm considering a "Multi-purpose indoor unit for use in 4-pipe systems for the simultaneous production of chilled and hot water by means of two independent water circuits". The unit transfers... Last reply: Marcus Sheffer, Oct 10, 2014, 5:00 pm |
|
kitchen hoodsNC-2009 EAp2: Minimum Energy Performanceposted by HOUCINE TLEMSANI on Sep 11, 2014, 10:23 am
Hi, Last reply: Marcus Sheffer, Oct 10, 2014, 3:54 pm |
|
Exterior lighting powerNC-2009 EAp2: Minimum Energy Performanceposted by VICTOR MORENO on Oct 7, 2014, 11:25 am
Hello. One review comments that i have received about E&Ap2 prerequisite is: 2. No exterior lighting power has been modeled for the Baseline or Proposed Case. Confirm that no... Last reply: Marcus Sheffer, Oct 9, 2014, 7:37 pm |