Topic | Recent |
---|---|
Pumps TypeNC-2009 EAp2: Minimum Energy Performanceposted by Saif Abdulameer on Jul 21, 2017, 10:08 am
Hello, For app G 90.1 it does not say explicitly if the pump should be constant or variable flow for the primary chilled water pump, the same thing for the condensing water pumps. I am... Last reply: Saif Abdulameer, Jul 21, 2017, 2:08 pm |
|
Hot Water and Chilled Water Primary- Secondary PumpingNC-2009 EAp2: Minimum Energy Performanceposted by ESD Engineer on Jul 17, 2017, 1:11 pm
My project has Primary chilled water pumping and multiple distribution pumps after the heat exchange serving various... Last reply: Marcus Sheffer, Jul 17, 2017, 2:07 pm |
|
Fuel Rates for Non-traditional Fuel SourcesNC-2009 EAp2: Minimum Energy Performanceposted by Gopinath Vasu on Jul 10, 2017, 12:25 am
Hi All, I am working on a project where rice husk steam boiler is used for process. The fuel source (rice husk) is available at a free of cost for the project. So, as per LEED... Last reply: Marcus Sheffer, Jul 17, 2017, 10:37 am |
|
System 9- BaselineNC-2009 EAp2: Minimum Energy Performanceposted by Vassil Vassilev on Jul 4, 2017, 5:07 am
Greetings, Last reply: Marcus Sheffer, Jul 14, 2017, 12:36 pm |
|
MEPCalculator- Process Loads tabNC-2009 EAp2: Minimum Energy Performanceposted by Vassil Vassilev on Jul 13, 2017, 8:58 am
Greetings, Last reply: Vassil Vassilev, Jul 13, 2017, 12:23 pm |
|
Central Energy Plant and Service hot water heatingNC-2009 EAp2: Minimum Energy Performanceposted by ESD Engineer on Jul 11, 2017, 5:40 pm
My project is a hospital building and has a central energy plant which serves the building pursuing for LEED NC certification, i am modeling the plant efficiency based off DESv2 option 2 as the... Last reply: ESD Engineer, Jul 13, 2017, 12:10 pm |
|
Baseline DCV modelingNC-2009 EAp2: Minimum Energy Performanceposted by Vassil Vassilev on Jul 13, 2017, 3:47 am
Greetings, Last reply: Marcus Sheffer, Jul 13, 2017, 11:07 am |
|
Proposed case outside airflow ratesNC-2009 EAp2: Minimum Energy Performanceposted by Cagril Comert on Jul 11, 2017, 11:08 amMarcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5916 thumbs up July 11, 2017- 11:54 am How you model this could vary depending on the software you are using. In some software you need to create a dummy zone. For software specific questions usually the best place to try is either customer support (if it exists) or one of the discussion groups. There are several at onebuilding.org and http://energy-models.com/forum Log in or register to post comments ... Last reply: Marcus Sheffer, Jul 11, 2017, 11:54 am |
|
Incomplete spaces for solar panel and future process loadNC-2009 EAp2: Minimum Energy Performanceposted by Hanh Truong on Jul 9, 2017, 10:53 pm
Dear Sir, I am working on factory project which targets to reach a LEED 2009 certified level. The... Last reply: Hanh Truong, Jul 10, 2017, 10:32 pm |
|
ASHRAE 90.1-2007: Minimum Efficiency Requirements (Heat pump)NC-2009 EAp2: Minimum Energy Performanceposted by Jorge Mato Rial on Jun 27, 2017, 11:41 am
Hello Everyone: Last reply: Jorge Mato Rial, Jul 5, 2017, 2:53 am |