Topic

Pumps Type

NC-2009 EAp2: Minimum Energy Performance
posted by Saif Abdulameer on Jul 21, 2017, 10:08 am

Hello,

For app G 90.1 it does not say explicitly if the pump should be constant or variable flow for the primary chilled water pump, the same thing for the condensing water pumps. I am...

Last reply: Saif Abdulameer, Jul 21, 2017, 2:08 pm

Hot Water and Chilled Water Primary- Secondary Pumping

NC-2009 EAp2: Minimum Energy Performance
posted by ESD Engineer on Jul 17, 2017, 1:11 pm

My project has Primary chilled water pumping and multiple distribution pumps after the heat exchange serving various...

Last reply: Marcus Sheffer, Jul 17, 2017, 2:07 pm

Fuel Rates for Non-traditional Fuel Sources

NC-2009 EAp2: Minimum Energy Performance
posted by Gopinath Vasu on Jul 10, 2017, 12:25 am

Hi All,

I am working on a project where rice husk steam boiler is used for process. The fuel source (rice husk) is available at a free of cost for the project.

So, as per LEED...

Last reply: Marcus Sheffer, Jul 17, 2017, 10:37 am

System 9- Baseline

NC-2009 EAp2: Minimum Energy Performance
posted by Vassil Vassilev on Jul 4, 2017, 5:07 am

Greetings,
The question is related to modeling rooms/zones which are to be assigned to System 9.
In the Proposed, these rooms/zones are having supply, return and sometime room exhaust...

Last reply: Marcus Sheffer, Jul 14, 2017, 12:36 pm

MEPCalculator- Process Loads tab

NC-2009 EAp2: Minimum Energy Performance
posted by Vassil Vassilev on Jul 13, 2017, 8:58 am

Greetings,
The abreviation EFLH applied to Garage Fan Power Calculation is unnown to me.
Could someone please explain it and also if there are some special provisions related to it,...

Last reply: Vassil Vassilev, Jul 13, 2017, 12:23 pm

Central Energy Plant and Service hot water heating

NC-2009 EAp2: Minimum Energy Performance
posted by ESD Engineer on Jul 11, 2017, 5:40 pm

My project is a hospital building and has a central energy plant which serves the building pursuing for LEED NC certification, i am modeling the plant efficiency based off DESv2 option 2 as the...

Last reply: ESD Engineer, Jul 13, 2017, 12:10 pm

Baseline DCV modeling

NC-2009 EAp2: Minimum Energy Performance
posted by Vassil Vassilev on Jul 13, 2017, 3:47 am

Greetings,
The following issue is somehow not clear and any support is highly appreciated.
The project belongs to system 7 (LEEDv2009) and has to be modeled with one...

Last reply: Marcus Sheffer, Jul 13, 2017, 11:07 am

Proposed case outside airflow rates

NC-2009 EAp2: Minimum Energy Performance
posted by Cagril Comert on Jul 11, 2017, 11:08 am

Marcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5916 thumbs up July 11, 2017- 11:54 am How you model this could vary depending on the software you are using. In some software you need to create a dummy zone. For software specific questions usually the best place to try is either customer support (if it exists) or one of the discussion groups. There are several at onebuilding.org and http://energy-models.com/forum Log in or register to post comments ...

Last reply: Marcus Sheffer, Jul 11, 2017, 11:54 am

Incomplete spaces for solar panel and future process load

NC-2009 EAp2: Minimum Energy Performance
posted by Hanh Truong on Jul 9, 2017, 10:53 pm

Dear Sir,

I am working on factory project which targets to reach a LEED 2009 certified level. The...

Last reply: Hanh Truong, Jul 10, 2017, 10:32 pm

ASHRAE 90.1-2007: Minimum Efficiency Requirements (Heat pump)

NC-2009 EAp2: Minimum Energy Performance
posted by Jorge Mato Rial on Jun 27, 2017, 11:41 am

Hello Everyone:
I am working in an office building project located in Galicia (Spain). We are carrying out the selection process of the heat pump for the air conditioning of the building....

Last reply: Jorge Mato Rial, Jul 5, 2017, 2:53 am