Having Trouble Getting Compliance for EAp2NC-2009 EAp2: Minimum Energy Performanceposted by Brian ORourke on Jan 23, 2012, 1:55 pm
I am working on a LEED project and we hired an engineer to run an energy model on EQuest. He then submitted all the required forms and entered all of the information onto the associated form,... Last reply: Marcus Sheffer, Jan 23, 2012, 2:11 pm |
|
Utility Service Changed During ConstructionNC-2009 EAp2: Minimum Energy Performanceposted by Candice Rogers on Jan 20, 2012, 9:45 am
Hello - Last reply: Candice Rogers, Jan 20, 2012, 11:05 am |
|
Energy Savings via DHW Savings?NC-2009 EAp2: Minimum Energy Performanceposted by Luke Falk on Jan 18, 2012, 10:55 am
Does LEED NC v2009 allow us to model and receive credit for energy savings resulting from... Last reply: Marcus Sheffer, Jan 18, 2012, 11:15 am |
|
Pool Cover and Air souce heat pumpNC-2009 EAp2: Minimum Energy Performanceposted by Arub Vijay on Jan 10, 2012, 3:55 am
Can the mandatory requirement of swimming pool cover be exempted if an air-souce heat pump is used for pool heating? The pool is heated to 30 ºC, is the pool cover mandatory in this case... Last reply: Marcus Sheffer, Jan 10, 2012, 10:01 am |
|
LEED boundary and Major AdditionsNC-2009 EAp2: Minimum Energy Performanceposted by Len Sciarra on Jan 7, 2012, 11:50 pm
A new project, under LEED-NC, is a major addition to an existing building, in this case a manufacturing facility which will result in basically three sections New Office, Existing Office, and... Last reply: Marcus Sheffer, Jan 9, 2012, 10:00 am |
|
Standard baseline for each piece of medical equipmentNC-2009 EAp2: Minimum Energy Performanceposted by James Chueh on Dec 27, 2011, 11:41 am
I am building a model for healthcare project and trying to save energy use as much as possible, but the energy use of medical equipment is huge. There are some comments about finding the standard... Last reply: Marcus Sheffer, Dec 28, 2011, 10:51 am |
|
Mandatory Provisions for Major Renovation ProjectsNC-2009 EAp2: Minimum Energy Performanceposted by Deborah Spira on Nov 22, 2010, 4:06 am
We have a project building that is an existing building undergoing a major renovation. The building envelope will not be altered, exept for new window glazing. The HVAC-system and electrical... Last reply: Marcus Sheffer, Dec 20, 2011, 2:18 pm |
|
Building Simulation for a non AC FacilityNC-2009 EAp2: Minimum Energy Performanceposted by Udana Ratnayake on Dec 7, 2011, 10:06 pm
We are working in a Garment Factory project in Sri Lanka where the facility is to be LEED certified. Whole building will be put up as a non air conditioned facility. mechanical ventilation... Last reply: Marcus Sheffer, Dec 20, 2011, 9:22 am |
|
DES BaselineNC-2009 EAp2: Minimum Energy Performanceposted by SUNG SU KIM on Dec 8, 2011, 3:06 am
For HVAC System, Our project team will apply to 2 absorption chillers and geo-exchange heat pump.(project site is located in... Last reply: Marcus Sheffer, Dec 9, 2011, 11:09 am |
|
Modeling Multiple BuildingsNC-2009 EAp2: Minimum Energy Performanceposted by Santiago Rodriguez on Dec 1, 2011, 2:07 pm
I am working on a new project which consists in 5 buildings, all have its own HVAC system designed, 3 of them have a complete HVAC, and the other 2 will only have Mechanical Ventilation to cool... Last reply: Marcus Sheffer, Dec 1, 2011, 2:30 pm |