Topic | Recent |
---|---|
City Stormwater FiltrationNC-2009 SSc6.2: Stormwater design - quality controlposted by Joel Cesare on Mar 9, 2012, 3:08 pm
Most of the stormwater runoff on our site will be directed to the city drain intake, which reportedly is equipped with enhanced filtration. Can this be used for... Last reply: Amy Rider, Mar 16, 2012, 4:02 pm |
|
Default percentage for removal of TSS by dislodging in a lagoonNC-2009 SSc6.2: Stormwater design - quality controlposted by marisol cano on Feb 28, 2012, 2:03 pm
Hello to all. Hope you can help me with this one. The Municipal Entity of my project requires us to discharge 100% of the stormwater into the City´s Lagoon "Laguna de Terminos" Last reply: Michael DeVuono, Mar 5, 2012, 8:34 pm |
|
define what is non-structural control and structural control 6.2NC-2009 SSc6.2: Stormwater design - quality controlposted by carol palansky on Dec 29, 2010, 7:12 pm
In doing our templete, I would like clarity of what each component is and some examples of each. Our company provided the landscaping portion for a green addition and remodel for an office... Last reply: Michael DeVuono, Mar 3, 2012, 9:40 am |
|
green roofNC-2009 SSc6.2: Stormwater design - quality controlposted by Emmanuel Pauwels on Mar 31, 2011, 8:03 am
We will install an extensive green roof in our project. Does anyone know what the runoff rarte is and how much... Last reply: Michael DeVuono, Mar 3, 2012, 9:34 am |
|
TSS removal efficiency % table?NC-2009 SSc6.2: Stormwater design - quality controlposted by Kash Boodjeh on Jul 19, 2011, 5:48 pm
What is the best resource for finding... Last reply: Michael DeVuono, Mar 3, 2012, 9:17 am |
|
Rainwater HarvestingNC-2009 SSc6.2: Stormwater design - quality controlposted by Udana Ratnayake on Jan 19, 2012, 5:25 am
Our project is harvesting and reusing rainwater for flushing. rainwater that falls on the roof is collected in a 10cubic meter sump. during a heavy rain the sump is allowed to over flow and the... Last reply: Amy Rider, Feb 22, 2012, 5:33 pm |
|
Reducing Impervious a requirement or a strategy?NC-2009 SSc6.2: Stormwater design - quality controlposted by Lauren Ford on Feb 14, 2012, 8:11 pm
If we are increasing the total impervious area on the site, but treating the stormwater to reduce the... Last reply: Tristan Roberts, Feb 15, 2012, 12:46 am |
|
Annual Rainfall Volume CalculationNC-2009 SSc6.2: Stormwater design - quality controlposted by Jeremy Knoll on Jan 17, 2011, 3:54 pm
The civil engineer on my project is having trouble finding a source for exactly how the annual rainfall volume is supposed to be calculated. Can anyone point me (us) to an example or resource... Last reply: Emily Catacchio, Jan 27, 2012, 8:14 pm |
|
Project with large natural green areas.NC-2009 SSc6.2: Stormwater design - quality controlposted by Renaud Gay on Aug 7, 2011, 2:11 am
I am a little bit confused by this project and would like to have your advise. Many thanks in advance! I work for resort in China made of small houses in a previously undeveloped natural... Last reply: Amy Rider, Dec 19, 2011, 5:42 pm |
|
Calculating 90% rainfall complianceNC-2009 SSc6.2: Stormwater design - quality controlposted by Simon Sue on Nov 29, 2011, 8:17 pm
We're currently working on a high-rise commercial building, and hope someone could shed some lights on the following questions: 1. Is it ok to calculate the % of rainfall captured and... Last reply: Amy Rider, Dec 6, 2011, 12:35 pm |