Clarification on Minimum Daily Transit Service
Pilot-Credits PC12:Reduced Automobile Dependenceposted by Colin Inderwish on
We're also attempting option 1. The project is located in a fairly dense area with a total of 4 different light rail stops within a 1/2 mile walking distance.
online form
NC-2009 MRc2:Construction Waste Managementposted by Rick Vayo on
Hi, I'm having trouble with the online form. I've filled in the required information, but the percentage of waste diverted is not totaling for me. I'm not sure what I'm doing wrong. thanks,
Electric bicycles in Asia
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Louise Schlatter on
We are starting to get projects in Asia and have learned that they use both standard (human operated) bicycles and also something we don't have in the US: electric bicycles.
Phased Occupancy and IAQ Testing
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Melissa Wrolstad on
I have a CI project with 4 floors and phased occupancy. Two floors will be occupied while two are still under construction.
Option 3, Approach 2 – selection of a random sample by elevators
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Jessica Hawley on
We have a 6 story multi-tenant downtown office building located in close proximity to public transportation.
Data center --IT energy sub meter calibration
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Shoko Yasuda on
Hi, I am involved in EBOM case with a data center. As noted above, basically we do not need calibration since we use data from utility bill. Yet for a data center we have to measure UPS output ener