Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

GLP vs. Natural Gas

NC-2009 EAp2:Minimum Energy Performance
posted by  Marcio Alberto Casado Pereira  on 

Does LEED make a difference between GLP and Natural Gas? EAp2 template contemplates natural gas and electricity but we have showers that use GLP for domestic water heating.

3
Thu Apr 25, 2013, 5:41 pm

Energy Model Software

NC-2009 EAp2:Minimum Energy Performance
posted by  Pat Thomas  on 

I was just told by someone who 'used to work for USGBC' that use of eQuest requires prior approval, project by project ?? Does this make any sense to you ??

3
SUSTAINABILITY COORDINATOR
JALRW Eng. Group Inc.
LEEDuser Basic Member
24 thumbs up
Thu Apr 25, 2013, 2:57 pm

BLOW OUT FIXTURE

CS-2009 WEp1:Water Use Reduction
posted by  OSCAR DE LA RED  on 

Do I have to use the 3.5 gpf for baseline and installed blow out fixture if installed fixture is lower than 1.6 gpf.

2
Thu Apr 25, 2013, 7:57 am

Showering and Changing Facilities in Men´s Bathroom

CI-2009 SSc3.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Silvia Ruiz  on 

Hi, I am working on a small project that only requires one shower, but due to space constraints, the shower and changing room have been located inside the men's bathroom facilities.

4
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Apr 25, 2013, 4:15 am

Title-24 and DES

General forums
posted by  Lauren Sparandara  on 

Hello, I have taken a look at Appendix B which includes Title-24 guidance within the District Thermal Energy LEED Guidance document.

8
Default Avatar
mechanical engineer
state of californiat
LEEDuser Basic Member
0 thumbs up
Thu Apr 25, 2013, 1:28 am

Tandem Spaces

CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Michael E. Edmonds-Bauer  on 

Our project, due to physical limitations of the site being this quite small, is providing mostly all of the spaces in tandem across 8 underground levels. According to calculations we need to provi

4
Wed Apr 24, 2013, 6:09 pm

International Project without Cut Sheets

NC-2009 MRc4:Recycled Content
posted by  Josh Sawyer  on 

We are working on an international project and the contractor is telling us that the standards in their country lack cut-sheets and MSDS sheets.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Apr 24, 2013, 5:01 pm

new LEED Interpretation

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Tristan Roberts  on 

A new LEED Interpretation was released on 4/1/13 that is relevant to this credit.

3
Default Avatar
Woolpert
LEEDuser Basic Member
5 thumbs up
Wed Apr 24, 2013, 12:56 pm

waste stream audit

Waste Stream Audit Protocol
posted by  Fatma Al-Fahad  on 
1)During the solid waste audit process, is it accepted to include all kinds of paper under one description( mixed paper)?
3
Default Avatar
Principal Project Manager
Jones Lang LaSalle GmbH
LEEDuser Basic Member
2 thumbs up
Tue Apr 23, 2013, 8:56 pm

Upload Documentation

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Albert Sagrera  on 

How can we upload documentation justifying this credit? Calculations on 90% average annual rainfall, 80% TSS removal, and other documentation?

3
Default Avatar
Architect
Societat Organica
LEEDuser Basic Member
11 thumbs up
Tue Apr 23, 2013, 3:13 pm