Forum quick links
EA Credit 1 - Using available waste oil for heating
NC-2009 EAc1:Optimize Energy Performanceposted by Charlene Steinman on
My project has unlimited free waste engine oil available.
Restored materials
NC-2009 MRc5:Regional Materialsposted by jaume balana on
Our project scope is an historical building restoration and retrofit. Several items such as windows, doors and floor tiles are removed, restored in a workshop near the site project and returned to
Option 1, Case 1, Stream Channel Protection
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Adi Negara, LEED AP BD+C on
Hi all, We have a new construction project that is to build 30 ha factory, however the owner decided only to pursue LEED certification for the office building site, a small portion of the factory
Mechanics of Appealing
posted by Kathy Wislocky on
Since this is the first time I need to submit an appeal, I would love some advice on the order of what needs to be done online and what I should expect. LEED Online: I haven't touched any of the
Capturing rainwater and discharge to the public sewer
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Panupant Phapant on
The FAQ of SSc6.2 (http://www.leeduser.com/credit/NC-2009/SSc6.2#sthash.3UFoAJvd.dpuf) suggests that capturing the rainwater into tanks and discharging it into the public sewers after the rainstorm
LEED online-cannot reach the credit forms
posted by ebru unver on
Hello, I need some help about the leed-online forms. This is my first Project as Project admin. We have paid the registration fee and completed registration, and have selected split review.
Latest Minimum Requirements for IEQc6.1
CI-2009 IEQc6.1:Controllability of Systems—Lightingposted by Kathy Wislocky on
I see a few posts discussing the minimum requirements for both private offices and shared multi-occupant spaces, but some discussions are older and I'm wondering if LEED reviewer expectations or mi
Qualifying for MRc3
EBOM-2009 MRc3:Sustainable Purchasing—Facility Alterations and Additionsposted by Kelly Webb on
Our project (111,000+ sq ft, six story office building) will have an entire floor remodel, lobby entry remodel, and four restroom remodels all occurring during the performance period, albeit not si
EAc2 Submission Requirements
CI-2009 EAc2:Enhanced Commissioningposted by John Steingraeber on
I am very interested in pursuing LEED CI certification for a buildout of my firm's offices. This will be my/our first LEED project.