Forum » NC-2009 SSp1
Topic

Date Stamped Photos

NC-2009 SSp1: Construction Activity Pollution Prevention
posted by Maya Karkour on Apr 2, 2012, 8:13 am

Dear all,

There are many cameras which do not print a datestamp on the photos (new cameras usually save the date in the photo properties).

Can the person who captures the photos,...

Last reply: Samantha Harrell, Apr 2, 2012, 11:07 am

Air Pollution Prevention

NC-2009 SSp1: Construction Activity Pollution Prevention
posted by Ellen Mitchell on Mar 20, 2012, 5:03 pm

This week I have had two projects returned to me from the preliminary construction review with the same comment. I have never seen this comment before and am a little perplexed. The comment...

Last reply: Allen Cornett, Mar 27, 2012, 10:30 am

Level of detail needed in ESC?

NC-2009 SSp1: Construction Activity Pollution Prevention
posted by Patty Breech on Feb 13, 2012, 8:26 pm

This is vaguely referenced in other posts, but I'm still confused: what is the level of detail we need to submit for our written Erosion & Sedimentation Control (...

Last reply: Jhoan Montano, Feb 29, 2012, 1:13 pm

A client with ongoing site works asks about LEED feasibility

NC-2009 SSp1: Construction Activity Pollution Prevention
posted by Mauricio Ramirez on Jan 25, 2012, 10:13 am

The owner of a project is considering the possibility of the project to become LEED Certified. The current works on site include a excavation of a hill, and the works had been conducted following...

Last reply: Tristan Roberts, Feb 24, 2012, 11:35 am

Late implementation no.2

NC-2009 SSp1: Construction Activity Pollution Prevention
posted by Anna Korinkova on Jan 19, 2012, 4:03 am

Hello all,
I have another question regarding late implementation of the EPA’s requirements.
Our project is a shopping mall in Prague, Czech Republic. The client considers LEED...

NC Major Renovation with minimal site disturbance

NC-2009 SSp1: Construction Activity Pollution Prevention
posted by Monika Mickute on Jan 13, 2012, 4:09 pm

Dear LEEDUsers,

We are working towards certifying our own office building (an existing 50 year old, single story...

Last reply: Steve Loppnow, Jan 16, 2012, 11:56 am

ESC control: flat land, low water mantle and no drainage sewer

NC-2009 SSp1: Construction Activity Pollution Prevention
posted by marisol cano on Nov 1, 2010, 8:13 pm

Hello.
I’m doing a project in Ciudad del Carmen, Mexico. The terrain is completely flat and porous, the water table is 30 cm to 1 mt below the ground and there is no drainage sewer in the...

Last reply: Steve Loppnow, Dec 15, 2011, 7:23 pm

Cleared land- How to consider stockpilling?

NC-2009 SSp1: Construction Activity Pollution Prevention
posted by Gabriela Hernández Castillo on Dec 20, 2010, 11:36 pm

If a site has been bought with all vegetation removed by the previous owner the stockpiling will not longer be available because the site has been already clared-out of any existing vegetation,...

Last reply: Steve Loppnow, Dec 15, 2011, 7:18 pm

BMPs from Stormwater Management Manual for Western Washington

NC-2009 SSp1: Construction Activity Pollution Prevention
posted by Jutta Berns on May 24, 2011, 9:48 am

for SSp1 would it be acceptable to choose BMPs from the Stormwater Management Manual for Western Washington, which is referenced for the GIBp4 prerequisite in LEED Neighborhood Development? or do...

Last reply: Steve Loppnow, Dec 15, 2011, 6:40 pm

ESC Plan and CAPP Plan for Sloped Site

NC-2009 SSp1: Construction Activity Pollution Prevention
posted by Arub Vijay on Nov 8, 2011, 8:20 am

We have a Hotel project which will be constructed on a mountain with the whole site having a slope towards west. The 8 storied building is flush with the mountain such that only one or two sides...

Last reply: Steve Loppnow, Dec 15, 2011, 6:35 pm