Low impact Eco ResortNC-2009 MPR2: Must be a complete, permanent building or spaceposted by John Covello on Jul 22, 2015, 2:34 am
Hello, My company is looking to partner with the development of a low impact resort on an island located in Myanmar. It will have safari style rooms which will be part... Last reply: Marcus Sheffer, Jul 24, 2015, 11:22 am |
|
Existing Building Renovation and Site WorkNC-2009 MPR2: Must be a complete, permanent building or spaceposted by Catherine Adams on Jun 9, 2015, 4:41 pm
We have an existing two-story community recreation center with an adjacent parking lot. Most(about 75%) of the... Last reply: Marcus Sheffer, Jun 9, 2015, 5:15 pm |
|
Tenant FinishesNC-2009 MPR2: Must be a complete, permanent building or spaceposted by Ralph Bicknese on May 14, 2015, 6:00 pm
For a museum project registered under NCv2009 there will be a museum store and food service areas that will be "finished by tenant". These two spaces total approximately 5% of the total building... Last reply: Marcus Sheffer, Jun 4, 2015, 12:04 pm |
|
Addition To An Existing Certified BuildingNC-2009 MPR2: Must be a complete, permanent building or spaceposted by Timothy VanOudenhoven on Oct 10, 2014, 4:38 pm
I am currently working on a project where an existing certified building will have major renovation to the interior of the existing and an addition added to the existing certified building.... Last reply: Marcus Sheffer, May 18, 2015, 9:24 am |
|
New addition to existing vs. MPR#2NC-2009 MPR2: Must be a complete, permanent building or spaceposted by maartje van roosmalen on Feb 25, 2015, 5:45 am
Existing (all Last reply: Marcus Sheffer, May 18, 2015, 9:20 am |
|
Certifying New Addition, excluding Existing BuildingNC-2009 MPR2: Must be a complete, permanent building or spaceposted by Kris Phillips on Mar 16, 2015, 2:27 pm
A client is preparing for the development and design of a sizeable New Addition to an Existing Facility in Europe. The Existing Facility was constructed recently (within the last 5 years), but it... Last reply: Marcus Sheffer, May 18, 2015, 9:19 am |
|
Addition to existing buildingNC-2009 MPR2: Must be a complete, permanent building or spaceposted by Kasandra Martin on Mar 16, 2015, 12:19 pm
We are building an addition to an existing non-LEED building and only adding a wall in the existing building. Originally we were going for LEED v2009 NC and now switched to... Last reply: Kris Phillips, Mar 16, 2015, 12:50 pm |
|
Two new buildings joined by unconditioned walkwayNC-2009 MPR2: Must be a complete, permanent building or spaceposted by P Fanfulik on Jan 21, 2015, 9:08 am
I have a new bus garage (maintenance and admin offices) connected to the fuel/wash building by an open air bridge (unconditioned space). The designer intends to use the bush wash reclaim system... Last reply: P Fanfulik, Jan 21, 2015, 12:30 pm |
|
Thresholds, Prerequisites, Lease Language, 10102NC-2009 MPR2: Must be a complete, permanent building or spaceposted by Katie Peterschmidt on Aug 19, 2014, 7:40 pm
I am working on a mixed-use building that is required by municipal code to achieve LEED Silver. The current project design has approximately 58% high-rise multi-family residential (LEED-NC) on... Last reply: Katie Peterschmidt, Dec 15, 2014, 10:55 pm |
|
Certification RQs for Incomplete BuildingNC-2009 MPR2: Must be a complete, permanent building or spaceposted by Orçun Özhelvaci on Dec 8, 2014, 11:11 am
Our university building undergoes it's construction stage. There are 2 main wings (refer to... Last reply: Orçun Özhelvaci, Dec 11, 2014, 2:20 am |