Developement on EAp2?

General forums
posted by  Jean Marais  on 

Are there any plans to do the same sort of thing with EAp2?

2
Principal
Emerald Built Environments
LEEDuser Basic Member
900 thumbs up
Fri Apr 3, 2015, 12:15 pm

Actual Material Cost vs. Material Cost: what's the difference?

NC-2009 MRc4:Recycled Content
posted by  Marcio Alberto Casado Pereira  on 

We received a review comment regarding credits MRc4 and MRc5 of a stadium we are working on in Brazil.

20
Default Avatar
Sustainability Consultant
Dagher Engineering
LEEDuser Basic Member
51 thumbs up
Fri Apr 3, 2015, 1:30 am

Categorizing a LEED project

LEED Rating System Selection
posted by  Adi Negara, LEED AP BD+C  on 

Hello all, I have a difficulty in determining the appropriate LEED rating system for a project, and I hope that you all can tell me what rating system is best suited to the project: The project ow

2
Thu Apr 2, 2015, 2:48 pm

LEED NC or EBOM ?

LEED Rating System Selection
posted by  Fabio Frescia  on 

Hi, We just got a project here in Thailand that just started, where our client would like to achieve a LEED certification. It's an existing resort and they want to renovate it.

3
PM, LEED AP
Arcadia (Thailand) Company Limited
LEEDuser Basic Member
0 thumbs up
Thu Apr 2, 2015, 2:35 pm

District cooling system with different construction planning

NC-v4 EAp2:Minimum energy performance
posted by  Jeroen Sap  on 

I have a project at hand with a high LEED ambition. They have the opportunity to connect to a future district cooling system (high efficiency).

3
LEED AP BD+C
Deerns Nederland B.V.
LEEDuser Basic Member
2 thumbs up
Wed Apr 1, 2015, 11:32 pm

Car Dealership

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Robert Shields  on 

We are working on a project to build a Toyota Dealership in Pennsylvania and the owner is seeking LEED Certification (LEED 2009).

2
President
HJKessler Associates
LEEDuser Basic Member
41 thumbs up
Wed Apr 1, 2015, 8:32 pm
7
Wed Apr 1, 2015, 6:36 pm

School project - Group certification

LEED Guidance for Campuses and Multiple Buildings
posted by  Maya Karkour  on 

Hello, we are working on a new K12 school project with 4 separate buildings (2 bldgs for classrooms, 1 administration and 1 sports center).

3
Default Avatar
EcoConsulting
LEEDuser Basic Member
549 thumbs up
Wed Apr 1, 2015, 4:08 pm

Rainwater storage tank TSS removal efficiency

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Manuel Martin Delgado  on 

Hi. We have designed a rainwater storage tank for dirty rainwater, with a bigger capacity than required. The water, after being storaged for a while, is pumped to the local sewerage system.

2
Wed Apr 1, 2015, 12:33 pm

Naturally ventilated corridors

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Stella Stella  on 

In one of our project we have a Main corridor that is completely open with just a parapet wall and roof overhang. Now we have another small corridor that is connected to this Main corridor.

11
Wed Apr 1, 2015, 11:27 am