Forum quick links
Exemplary Performance, Point 2
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Sara Zoumbaris on
Hi All, We are interested in attempting the exemplary performance point 2 for this credit on a five story collegiate residence hall.
Iconic Building with two layers of Facade
NC-2009 PIf2:Project Summary Detailsposted by Ahmed Mosa on
We are currently working on the design of an iconic building that has 2 layers of facade.
Exterior Lighting - Multiple Buildings
NC-2009 EAp2:Minimum Energy Performanceposted by Marina Andrade on
Hi, How is possible to consider Exterior Lighting Energy Consumption on a Multiple Building Process where there is no specific boundary per each building?
No Smoking Signs
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Crissy Tsai on
Where do the no smoking signs need to be located? All exterior doors? Only ingress doors? Thanks, Crissy
ASHRAE Manditory Requirements Insulation
NC-2009 EAp2:Minimum Energy Performanceposted by John Covello on
Hello, Is there a guide or list somewhere as to what materials are acceptable to use for insulation? We want to know what options we can use. Thanks. John
Construction of Stormwater Facility Containment
EBOM-2009 MRc9:Solid Waste Management—Facility Alterations and Additionsposted by Katherine Ann Resurreccion on
Hi! Our project is pursuing both MRc3 and MRc9.
LEED EB:OM
posted by Lennart Lifvenhjelm on
Hi, If i want to certify a building that has about 30% current vacancies, does this affect the certification process in any way? Thank you!
EPDs and HPDs
posted by Jessica McNaughton on
With the new Materials and Resources credits in LEED v4, Environmental Product Declarations and Health Product Declarations seem to be the way of the future for product documentation.
Hydroseeding
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by JOSE R. TAGLE on
I have a Project that is considering “Hydroseeding” as a permanent landscape design.
Malfunctioning Water Meters
EBOM-2009 WEc1:Water Performance Measurementposted by Edward Malesevich on
Our project team is attempting the whole building metering along with the submetering option.