LEED Construction Submission
posted by Christopher Strunk on
Had a question from a client on when we can submit the LEED-NC 2009 Construction Submission. Can the submission be made prior to all commissioning being completed and documented?
daylight sensing
NC-2009 EAc1:Optimize Energy Performanceposted by Francesco Passerini on
I wonder whether daylight sensing (lights are dimmed automatically according to daylight) can increase the points a project can obtain in this credit. Table G36.2 doesn’t mention such a system.
Data Center in Portfolio Manager
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Charalampos Giannikopoulos on
How should a Data Center building facility be included in the Portfolio Manager? The building hosts the data center and the supporting offices.
Data Center in Portfolio Manager
Data-Centers-EBOM-v4 EAp2:Minimum energy performanceposted by Charalampos Giannikopoulos on
How should a Data Center building facility be included in the Portfolio Manager? The building hosts the data center and the supporting offices.
Furniture components assembled on-site
CI-2009 MRc5:Regional Materialsposted by Eric Thompson on
We have a project where elements of the furniture are coming to the jobsite and being assembled there.
ID credit in a hospital?
Schools-2009 IEQc10:Mold Preventionposted by Payette Library on
We're thinking about going for this credit for a Hospital project (NC v2.2), since code requires all hospitals to have strict mold prevention measures.
Parking Roof
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Noriko Nagazumi on
Are we supposed to include parking roofs on SSc7.2 heat island - roof's calculations? I assume that all roofs should be included.
Dricon: Fire-Retardant Treatment
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Kai Starn on
Hello all, I came across a fire treatment product (Dricon: Fire-Retardant Treatment).
Theater lighting
NC-2009 EAc1:Optimize Energy Performanceposted by Keelan Kaiser on
I've gone through the threads and can't find a response for a question like this, there must be one, but we have a theater project with all of the speciality lighting associated with this use.
IEQ c4.3 Flooring
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Rezkar Abdulmajeed on
We have a project with some floor areas designed to be ceramic and quarry tiles. Can someone advise if the two above need to meet floorscore standrads. your comments are appreciated