Can ebom 2009 use IEQp1 v3 forms?
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by James Doyle on
Our EBOM 2009 project (registered in late 2011 or early 2012) Score Card indicates that for IEQp1 we are to use the v4 form.
Spray Paint?
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by Nate Gillette on
I see that spray paint is exempt for NC. What about EB? If it meets the criteria, can it count toward the total?
FTE shifts longer than 8 hrs
posted by Lisa Sawin on
We are working on Police Facility. Some of the full time occupants work longer than 8 hours shifts.
OPTION 2: Metered Water Use
EBOM-v4 WEp1:Indoor water use reductionposted by Lorne Mlotek on
I am a little confused here: Credit language states the following: • Meter fixtures and fittings and record metered data for one year to establish a water-use baseline. • For projects with at lea
Basic Manual Shades
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Emmanuel Gee on
Can basic manual operated fabric shades be used for areas that are above 500fc? Something such as a Draper Manual Flexshade? Thanks
Proposed building sharing bounding wall with neighbor building.
NC-2009 EAp2:Minimum Energy Performanceposted by Zonda E. Team on
The building has two of its bounding walls shared with its neighbour buildings. First question is, is a shared bounding wall considered part of the envelope?
LEED online form
NC-2009 EAp2:Minimum Energy Performanceposted by Sylvain laporte on
Does someone knows why the leed online v4 form( so called newest in the documentation toolkit) does not include the 3 options as it was in the v3 form.
ASHRAE 62.1-2013 Version
NC-v4 EQp1:Minimum indoor air quality performanceposted by Adam Stoker on
Will compliance with the ASHRAE 62.1-2013 standard be acceptable for LEED v4 projects (even though the credit currently references ASHRAE 62.1-2010)?
Measuring water use in a commercial clothes washer
Healthcare-v2009 WEp1:Water use reductionposted by Mark Meaders on
We are looking to verify how the water use in a commercial clothes washer is calculated to see if it complies with the baseline of 9 gal/ CF/ cycle.
Re-certification of a LEED 2009 EBOM project in 2017
EBOM-2009 PIf1:Minimum Program Requirementsposted by Melissa Merryweather on
My client's successful LEED EBOM 2009 project was certified in 2012. Will my client have to upgrade to V4 when they re-certify or will they be allowed to continue with the LEED 2009 system?