Table EA.P.2.1 Space Summary

NC-2009 EAp2:Minimum energy performance
posted by  Christopher Strunk  on 

Quick Question on filling out this summary chart: Within the LEED BD&C v.2009 reference manual (page 279) they indicate a very generic breakdown of building spaces based on occupancy types - a

1
Mon Feb 4, 2013, 7:10 pm

International Project - Signage issues

NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehicles
posted by  Jaida Anderson-Lozano  on 

Our project has been denied this credit because we do not use the exact verbage required for the signage.

1
Wed Mar 20, 2013, 10:47 pm

Wood and plastic composite

NC-2009 IEQc4.4:Low-emitting materials - composite wood and agrifiber products
posted by  Noriko Nagazumi  on 

Is it correct to state that wood and plastic composites are not included in this credit requirements? Quoted from above: "Composite wood and agrifiber products are defined as particleboard, medium

1
Wed Feb 6, 2013, 1:25 pm

Dismantling of building

NC-2009 MRc3:Materials reuse
posted by  Tanja Arnesson  on 

Hi, We have a site were four different buildings will be conducted. Within the contract from the municipality demolition of two buildings should be carried out before the new construction.

1
Thu Feb 7, 2013, 7:04 pm

District Energy Systems: Confusion

CI-2009 EAc1.3:Optimize energy performance - HVAC
posted by  Marco Abdallah  on 

We are working on a CI-Certification of a tenant space (5 floors) in a highrise building with around 40 floors.

1
Wed Mar 4, 2015, 10:36 pm

WEc1 Option 1

NC-2009 WEc1:Water efficient landscaping
posted by  Arzu Tugrul  on 

We have a project located in Vienna. More than %80 of the landscaped areas has been designed for no irrigation including green roof.

0

Green Power Requirement per DES Guidance

General forums
posted by  yanghee pierce  on 

Could anyone help me understand the green power requirement for a project using energy model Option 1 for EA c1 per DES guidance, please?

1
Thu Mar 21, 2013, 4:54 pm

roll-out mat specs

NC-2009 IEQc5:Indoor chemical and pollutant source control
posted by  NA AN  on 

I just want to check if there are any specific product specs for a LEED compliant roll-out mat? thank you Na

1
Thu Feb 7, 2013, 12:07 am

LED Lamps in Fixtures Designed for Other Lamps

NC-2009 EAc1:Optimize energy performance
posted by  Pat Thomas  on 

We are planning to use fixtures designed for use with MR-16 or incandescent lamp but will be installing LED lamps.

1
Thu Feb 7, 2013, 1:54 pm

LEED CS and CI - fit out works made by the developer

LEED Rating System Selection
posted by  Elodie DUMAS  on 

Dear all, I have a question regarding LEED CS and LEED CI rating systems.

1
Mon Feb 18, 2013, 2:27 am