Quick Question on filling out this summary chart: Within the LEED BD&C v.2009 reference manual (page 279) they indicate a very generic breakdown of building spaces based on occupancy types - as opposed to a detailed breakdown of actual individual spaces. I'm involved with a large school project with hundreds of various spaces - all of which could be summarized in probably 15 different space classifications (i.e. classrooms, office, conference, laboratory, lobby, etc). So my question is: Is the GBCI looking for a generalized breakdown of the building or do they want a detailed description of every space?