phased campus plan using 2010 AGMBC

LEED Guidance for Campuses and Multiple Buildings
posted by  Norma Lehman  on 

how do you deal with a phased master plan? initially create the Master Site to encompass all future phases? or create Master Site each time a new phase starts?

3
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Wed Jun 27, 2012, 8:24 am
7
Default Avatar
Director
Energetica Soluciones y Consultoria IAC S.A.
LEEDuser Basic Member
2 thumbs up
Wed Jun 27, 2012, 12:42 am

Number of preferred spaces

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Craig Flandermeyer  on 

I am pursuing option 1, preferred parking, for a building on a campus. The new parking lot expands an existing parking lot for an adjacent building.

4
Tue Jun 26, 2012, 8:49 pm

Ashrae 90.1

CS-2009 EAp2:Minimum Energy Performance
posted by  Ron Dean  on 

Hello, I am wonderinq if you can help me: where no heating system exists the heating system classification shall be asummed to be electric, and the system characteristics shall be identical to the

3
Default Avatar
Sumac Inc.
LEEDuser Basic Member
20 thumbs up
Tue Jun 26, 2012, 8:42 pm

Identical fan power?

CS-2009 EAp2:Minimum Energy Performance
posted by  Laura Howe  on 

We have a comment back from GBCI, stating: 1. The Baseline fan power calculations and the SV-A reports for the Baseline model indicate that the exhaust fan systems (xxx1 and xxx2, as indicated in

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Jun 26, 2012, 8:06 pm

Pursuing additional credits after final certification review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  jim bell  on 

We have a project that has received final design and construction review. The project has fallen short of the threshold for Silver. What is the method to pursue additional credits?

5
Principal
DNA GreenDesign
LEEDuser Basic Member
126 thumbs up
Tue Jun 26, 2012, 3:57 pm

GreenStar

CI-2009 SSc1:Site Selection
posted by  Joel Register  on 

Hello - I have a new CI tenant fit out project in Sydney, Australia - within "1 Bligh St." considered by some to be the greenest office tower in the world.

3
Principal
Emerald Built Environments
LEEDuser Basic Member
900 thumbs up
Tue Jun 26, 2012, 2:07 pm

SRI for light-colored wood

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  Maya Karkour  on 

Does anyone know the typical SRI range for wood (light colored to dark colored)? I know that it differs from one product to another, and that we need the manufacturer's documentation proving the S

3
Default Avatar
EcoConsulting
LEEDuser Basic Member
549 thumbs up
Mon Jun 25, 2012, 9:50 pm

IDC Material and Resource Calculator (June 2011).xls

CI-2009 MRc5:Regional Materials
posted by  Derek Fung  on 

In June 2011, a new credit template upload requirement was added, the USGBC version of the materials data spreadsheet.

3
Default Avatar
SL+A INTERNATIONAL ASIA INC.
LEEDuser Premium Member
305 thumbs up
Mon Jun 25, 2012, 4:33 pm

Elevator doors opening into residential unit & blower door test

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  S. Sachs  on 

Hi, Does anyone have experience with LEED NC requirements for credit EQp2 in a residential building where we'd like the elevator door to open directly into the unit and avoid putting in a door? Tha

2
Vice President
WSP Built Ecology
LEEDuser Basic Member
42 thumbs up
Mon Jun 25, 2012, 3:27 pm