NC-2009 MRc5:Regional Materialsposted by Mark Wilkinson on
We purchase plywood and laminate from local vendors and manufacturer laid-up laminate panels from these two inputs. These laid up panels are then modified into casework.
"Systematic mechanism for occupants to provide feedback?"
EBOM-2009 IEQc2.1:Occupant Comfort—Occupant Surveyposted by Elizabeth Crenshaw Hammitt on
Hello everyone, Does this refer to an ongoing system or a commitment to give out the survey more than once?
Glare Control Type Question
Schools-2009 IEQc8.1:Daylight and Views—Daylightposted by Ema S on
For the "glare control type"....can it be an overhang of a second floor, or a canopy that is used for glare control?
Stage 2 Pre-Certified LEED-ND Plan
ND-v2009 PIf1:Development Program and Site Typeposted by Chris Zitelli on
The first sentence in the reference guide describing Stage 2 certification notes that the Building square footage must be "fully entitled." The architect on the job has asked what that term means.
Building footprint definition
CS-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Ricardo Sá on
According to the LEEDuser glossary, «building footprint is the area on a project site used by the building structure, defined by the perimeter of the building plan».
Avoiding Fertilizer Application Less Sustainable?
EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Managementposted by Andy Rhoades on
We were recently denied a point on a project in which we worked with the landscape vendor to use half as much fertilizer as they were previously using.
Excel Spreadsheet
Schools-2009 IEQc8.1:Daylight and Views—Daylightposted by Ema S on
I have a couple of questions concerning the prescriptive method for achieving LEED credit 8.1.
Zone Floor Area ...Help!!!!!
Schools-2009 IEQc8.1:Daylight and Views—Daylightposted by Ema S on
Can someone please confirm the following.
How Calculate Raw Material Distance for New Option 2
NC-2009 MRc5:Regional Materialsposted by Charles Clark Jr on
The new Option 2 of MRc5 which was deemed to be applicable in the July 6, 2012 Addendum qualifies products and the raw materials used to make them based on the actual distance of the route they tra
Do we need to apply in an off-site mode?
EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitatposted by yan lian on
Our leed project is a single building with other 4 buildings surrounding it.