posted by David Eldridge on
If your normal process was to generate letter size documents for the project, then I don't see why GBCI would need to have them changed to another format. Legibility and usability will be the key
Flow Regulators with Pressure Compensation
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Surenthira Stephen Ramachanderan on
Hi Dan, I m currently doing couple of LEED C&S buildings.
Design Engineer Signatory
CI-2009 EAp2:Minimum Energy Performanceposted by Sundararaj Subburaman on
Please let me know if the HVAC Designer will be representing the Design Engineer Signatory for the EA P2? If not who will be the Design Engineer - MEP designer?
Tenant Lease and Sales Agreement x Design Review
posted by WAGNER OLIVEIRA SILVA on
Normally we send documents to Design Review before the project be sold in part or entirely by the Owner.
5 star Energy Star House
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by John Kinch on
Hello again, Our facility is already a 5 star energy rated building. Is there any way to cut corners on this paperwork? Thanks!
Innovative water efficiency
EBOM-2009 IOc1:Innovation in Operationsposted by Melissa Merryweather on
A project considering LEED EBOM is looking to add a new rainwater catchment system because it will be lower-cost then replacing old sanitary ware.
Multi-parameter alternative product analysis
Pilot-Credits PC2:PBT Source Reduction: Dioxins and Halogenated Organic Compoundsposted by Jeff Gearhart on
We are pursuing this credit for a CI project. Interested in any further guidance on "multi-parameter alternative product analysis".
Guadua
NC-2009 MRc6:Rapidly Renewable Materialsposted by Carlos Alberto Hoyos Soto on
I want to know if anyone has use guadua, and if it is considered as rapidly renewable material, thanks.
DES Commissioning
NC-2009 EAc3:Enhanced Commissioningposted by Margaret Montgomery on
We're looking at a project where we do meet all the conditions for enhanced commissioning that would indicate we need to commission the district energy plant (third party, local CHP plant), but we'
Maximum Points Available
EBOM-2009 EAc1:Optimize Energy Performanceposted by David Hubka on
The LEED O&M reference guide states that two points are available under EA Credit #1 for projects that follow Case 2 Option 2A however the LEED online template does not award credits under this