Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

registration

General forums
posted by  Esmeralda Ward  on 

Hello, I received an email about this webcast and am interested, however there is no link to register. Is this only open to upgraded membership holders? thanks.

5
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Apr 4, 2011, 6:08 pm
2
Project Manager
Johnson Braund,Inc
LEEDuser Basic Member
3 thumbs up
Mon Apr 4, 2011, 1:00 pm

Option 2: Floor Area Clarification

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Shannon Terrell  on 

If my bay depth to core is deeper than 2 times the height of the window, is the area beyond 2H still part of the floor area calculation?

2
Senior Project Manager
Zinner Consultants
LEEDuser Basic Member
110 thumbs up
Fri Apr 1, 2011, 10:09 pm
3
Default Avatar
LEEDuser Basic Member
107 thumbs up
Fri Apr 1, 2011, 8:15 pm

Flowing water Pressure for Kitchen Sink

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Yong Lee Low  on 

My project is a commercial building. All the fittings except Kitchen sink have been finalized.

2
Default Avatar
VP GM Commercial Business Unit
American Standard Brands
LEEDuser Basic Member
16 thumbs up
Fri Apr 1, 2011, 12:35 pm
4
Default Avatar
Vice President
Thornton Tomasetti
LEEDuser Premium Member
188 thumbs up
Fri Apr 1, 2011, 3:33 am

Error Message when trying to select Complete

EBOM-2009 WEc1:Water Performance Measurement
posted by  Cynthia Fowler  on 

I get the following message when I try to click "Complete" for the credit: "...Form shows that documentation requirements have not been met..." I checked and rechecked and verified that all the doc

3
Default Avatar
SL+A INTERNATIONAL ASIA INC.
LEEDuser Premium Member
305 thumbs up
Fri Apr 1, 2011, 2:54 am

BAS Lighting Controls

posted by  Nell Boyle  on 
5
Default Avatar
ecoPreserve: Building Sustainability
LEEDuser Basic Member
101 thumbs up
Thu Mar 31, 2011, 6:32 pm
6
Thu Mar 31, 2011, 2:25 pm

Enhanced CX 'Design Firm'

NC-2009 EAc3:Enhanced Commissioning
posted by  Julianne Laue  on 

If a firm is a AE firm and are signing the arch drawings, but not involved in MEP...can an engineer in the firm be the CX?

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Wed Mar 30, 2011, 8:20 pm