EAc6 Implementation

NC-2009 EAc6:Green power
posted by  Cassandra Kail  on 

Does the project need to purchase Green Power from its power provider (it is provided), or is there the option of purchasing RECs on the open market from other providers (given that costs may be ch

3
Principal
Sage Design & Consulting
LEEDuser Basic Member
55 thumbs up
Mon Nov 25, 2013, 5:39 pm

VOCs in Prefabricated buildings

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Therese Malm  on 

Hi, I'm working on a building which is largely made out of units which are prefabricated off site.

2
Mon Nov 25, 2013, 7:23 am

Determination of nonpotable water

NC-2009 WEc2:Innovative Wastewater Technologies
posted by  Adi Negara, LEED AP BD+C  on 

In general, buildings in our country usually get clean water from PDAM (the municipal water system), and this clean water have a quality standard that is not equal (below) to EPA's drinking water q

4
Sustainability Manager
KEMA Services
LEEDuser Basic Member
110 thumbs up
Mon Nov 25, 2013, 2:31 am

S12.2-2010

Schools-2009 IEQc9:Enhanced Acoustical Performance
posted by  Dana Murdoch  on 

I went to the asastore.aip.org site and they did not have the 2002 version available. Can I use the 2009/2010 version? Will it be more stringent??

4
Daniel Hicks, E.I., INCE
Geiler & Associates
LEEDuser Basic Member
175 thumbs up
Fri Nov 22, 2013, 7:16 pm

At what point is something considered non-monoculture?

EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitat
posted by  Allen Scerber  on 

During the value engineering process, a lot of the plantings were removed for budgetary reasons. I need to re-introduce them but judiciously to get back to the spirit of the credit.

3
Default Avatar
LEEDuser Basic Member
2 thumbs up
Thu Nov 21, 2013, 6:42 pm

Material invoices

NC-2009 MRc4:Recycled Content
posted by  Heather Holdridge  on 

I realize that actual material invoices are not required for upload, but I am on a project right now where many of the subs are giving me a percentage of the contract amount.

2
Default Avatar
Architect
RSP Architects Ltd.
LEEDuser Basic Member
14 thumbs up
Thu Nov 21, 2013, 11:39 am

blinds for individual workstations

EBOM-2009 IEQc2.2:Controllability of Systems—Lighting
posted by  Lyle Axelarris  on 

For multi-occupant spaces, a compliant option mentioned in the Bird's Eye View is to have an "on/off switch combined with blinds for a window." Is the same true for individual workspaces?

6
Wed Nov 20, 2013, 9:10 pm
5
Default Avatar
Business Development Manager
Entegrity
LEEDuser Basic Member
154 thumbs up
Wed Nov 20, 2013, 8:47 pm

Unpaved Parking

EBOM-2009 SSc7.1:Heat Island Reduction—Nonroof
posted by  Michael Smithing  on 

The reference guide indicates that parking should be included in the hardscape area - this is good because much of the parking at our project uses an open grid paving system.

5
Director - Green Building Advisory
Colliers International Ltd.
LEEDuser Basic Member
201 thumbs up
Wed Nov 20, 2013, 2:17 pm

Attached building

ND-v2009 GIBp1:Certified green building
posted by  Karyn Rodrigues  on 

Is it possible that an attached building (LEED certified) may be sufficient to meet the prerequisite GIBp1?

2
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Tue Nov 19, 2013, 10:56 pm