Calculation for recycling storage area

Healthcare-v2009 MRp1:Storage and collection of recyclables
posted by  yanghee pierce  on 

Hello, How does a project determine the minimum space (sf) required by LEED HC for recycling storage areas? How does a project determine the projected waste volume? Thanks!

2
Mon Dec 23, 2013, 4:50 pm

LEED Project Boundary

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Bernard Sagaiyaraj  on 

My project is an office tower located on a plot of land housing 5 other buildings. All hardscape and landscape on the ground outside these buildings are not within the scope of work of my project.

3
Fri Dec 20, 2013, 11:45 pm

Showers not dedicated to CI project only

CI-2009 SSc3.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Mike D  on 

The project consists of one floor of offices located within a building of 12 floors.

3
SW Regional Design Resilience Leader
Gensler
LEEDuser Basic Member
15 thumbs up
Fri Dec 20, 2013, 11:42 pm

Engineering vs Commissioning

CI-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Matthew VanSweden  on 

For projects under 50,000 sf, can the HVAC engineer and commissioning agent be the same person? Obviously not best practice but strictly speaking, is this allowable?

3
SUSTAINABILITY COORDINATOR
JALRW Eng. Group Inc.
LEEDuser Basic Member
24 thumbs up
Fri Dec 20, 2013, 11:28 pm

Ceramic Tiles only

CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by   Habitech Distretto Tecnologico Trentino  on 

Hi! We are working on a LEED CS v2009 where only ceramic tiles (flooring+wall base) will be installed as part of the CS scope of works.

5
LEED AP BD+C, O+M, Green Globes Professional
JLL
LEEDuser Basic Member
112 thumbs up
Fri Dec 20, 2013, 11:03 pm

rainwater for greenhouse food production

NC-2009 WEc2:Innovative Wastewater Technologies
posted by  Karl Heitman  on 

We are designing an 150,000 sf industrial production facility in Chicago with a greenhouse on the roof for food production.

3
Default Avatar
President
Heitman Architects Inc
LEEDuser Premium Member
4 thumbs up
Fri Dec 20, 2013, 10:49 pm

VOC Budget Process - If you make a mistake, you can still get it

Schools-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Walter Currin  on 

Does anyone have any guidance (or graphic/ spreadsheet) in making it through the VOC budget process?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Dec 20, 2013, 10:47 pm

New to leeds

General forums
posted by  Steve Griggs  on 

I'm a small developer and just trying to learn all I can about building a leed platinum building in upstate New York Project 1.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Dec 20, 2013, 9:12 pm

R407 F

NC-2009 EAp3:Fundamental Refrigerant Management
posted by  Charline SEYTIER  on 

Has anyone ever documented this prereq. with a system using R407F? It's not part of the drop down list on the form and we're not sure it will comply. Thanks in advance for your help!

2
Sustainability Manager
YR&G
LEEDuser Basic Member
55 thumbs up
Fri Dec 20, 2013, 8:49 pm

Mixed Mode Natural & Mechanical Ventilation...?

NC-2009 IEQc2:Increased Ventilation
posted by  Tony Ricketts  on 

Hi all, I have a project that seems only slightly different than many of the others I've seen posted here.

3
Default Avatar
Mechanical Engineer
CJL Engineering
LEEDuser Basic Member
22 thumbs up
Fri Dec 20, 2013, 8:42 pm