Measuring for an Office Building with 92 Heat Pumps

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Alan Grant  on 

My client has an office building with one outside air supply fan supplying ventilation air throughout the three story building via ductwork to 92 heat pump units.

6
Energy Efficiency Ninja
Grumman/Butkus Associates
LEEDuser Premium Member
64 thumbs up
Mon Oct 20, 2014, 4:46 pm

An unusual situation with Recycling Tickets

NC-2009 MRc2:Construction Waste Management
posted by  Christine Castellano  on 

As the general contractor on a recently completed LEED project, all of the tickets I've received from the off-site waste separation facility listed the tonnage diverted by item, i.e., concrete, met

3
Mon Oct 20, 2014, 4:09 pm

Fire Department Practice Burn

NC-2009 MRc2:Construction Waste Management
posted by  Brian Leet  on 

We have a project on a large campus which has involved demolition of over a dozen buildings.

2
Default Avatar
LEEDuser Expert
472 thumbs up
Mon Oct 20, 2014, 4:02 pm

DES Option 2 - Clarification

NC-2009 EAc1:Optimize Energy Performance
posted by  FABIO VIERO  on 

Hi, we are working on a LEED NC 2009 project consisting of an office building, where the thermal energy (heating via hot water) is generated and distributed by means of a municipal grid (about 40 m

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Oct 20, 2014, 3:37 pm

PU foam

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Emmanuel Pauwels  on 

Under what category would a 1-compnent mounting Polyurethane foam fall and consequently what would be the maximum VOC level allowed?

4
Mon Oct 20, 2014, 2:56 pm

No autosizing of equipment on proposed?

NC-2009 EAp2:Minimum Energy Performance
posted by  Saju Varghese  on 

Is there a reason why the equipment on the proposed can not be autosized?

2
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Mon Oct 20, 2014, 11:13 am

Exhaust Fan Testing in a Laboratory

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Alexis Thompson  on 

I am working on a laboratory project and we are gearing up to perform the exhaust fan testing internally.

6
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Fri Oct 17, 2014, 10:40 pm

What's in return?

General forums
posted by  Wing Ho  on 

As far as I know, the cost of $6000 a year is kind of like annual subscription fees for the LDP. After 12 months, you’ve to return the LDP back to USGBC in good shape.

2
Founder & CEO, LEED Fellow, BREEAM Fellow
BuildingWise LLC
LEEDuser Expert
224 thumbs up
Fri Oct 17, 2014, 6:21 pm

Zero lot line existing building renovation

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Kim Shinn  on 

This project is a re-skin, and interior re-fit. Complete preservation of the structure. There was no site soil distrubance. What is required for SSp1 documentation?

4
Default Avatar
LEEDuser Basic Member
0 thumbs up
Fri Oct 17, 2014, 4:19 pm

On-site renewable energy

NC-2009 EAp2:Minimum Energy Performance
posted by  Lise Dannesboe  on 

Hi! We are trying to offset as much as possible from our electricity consumption with on-site PV.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Oct 17, 2014, 5:40 am