Forum quick links
Ventilation requirements for naturally ventilated spaces
NC-2009 EAp2:Minimum Energy Performanceposted by Jean Marais on
A difficalt case: Radiant floor + Nat Vent LEED increased ventilation credit requires that when using the macroscopic airflow simulation compliance path for naturally ventilated spaces: 1) 90% of t
Modeling Thermal Zones
CS-2009 EAp2:Minimum Energy Performanceposted by Attiq Rahman on
I am modeling an office building for LEED which will house different tenants that will consists of a dental clinic and medical clinic etc. There are number of different spaces in the building.
Documentation language for international projects
posted by Saliha AIT on
Hi, USGBC said in a FAQ document that it is not needed to translate all documents in english but the important part of them.
PTAC MERV 13
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Erika Duran on
Based on the July 2010 addendum, MERV 13 Filters are only based on Outdoor air stream.
illuminance level of lighting power density of ashrae 90.1
CS-2009 EAp2:Minimum Energy Performanceposted by tiantian zhou on
ashrae 90.1 give the LPD of different space. But i want to know what the correspondent illuminance level is.
Non-US Projects
CI-2009 IEQc2:Increased Ventlilationposted by Phillip Cook on
It says that projects outside the US may use a local equivalent.
Part 2 of the article does talk about v4
posted by Nadav Malin on
Look like I was a little too quick to complain, in my long critique, about how Frank didn't make use of my interview.
Combined or separate submeters
CI-2009 EAc3:Measurement and Verificationposted by Mike D on
Does the credit require separate submeters for each equipment or can those be combined? Our project design includes a submeter that is for both the hot water and HAVC system combined.