Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Baseline Building HVAC systems

CI-v4 EAp2:Minimum energy performance
posted by  Paula Hernandez  on 

Hi,

We are modeling a portion of a building.

The building counts with two dedicated outdoor air systems that provdie outdoor air to the whole building.

1
Fri Sep 29, 2023, 1:13 pm

Lighting Zone definition according to MLO for ASHRAE compliance

NC-2009 SSc8:Light Pollution Reduction
posted by  LEED Pro Consultant  on 

We are developing a high rise multi-residential project (5 buildings) in a undeveloped land, the area is between the access to a national park and multiple neighborhood (residential units).

3
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Mon Sep 4, 2023, 9:19 am
4
Sun Sep 3, 2023, 8:49 pm

US DOE Advocacy Opportunity for Heat Pump Water Heaters

Green Commons
posted by  Clark Brockman  on 

Greetings Heat Pump Water Heater (HPWH) advocates!

We have an opportunity to advocate to the US DOE on behalf of HPWHs!

5
Director of Sustainability
isgenuity
LEEDuser Basic Member
0 thumbs up
Fri Sep 1, 2023, 6:14 pm

EPD Option 2: Optimization

NC-v4.1 MRc2:Environmental Product Declarations
posted by  Jane Rohde  on 

For this portion of the credit, the Baseline Documentation includes Industry Wide Type III EPDs

0

Interpreting "medical intervention" and "direct medical care"

Healthcare-v4 SSc7:Places of respite
posted by     on 

We are working on a Mental Health facility and we are curiosus about how to interpert "medical intervention" and "direct medical care: "The area is located where no medical intervention

0

VOC content for Insulation foam rolls with self adhesive.

NC-v4.1 EQc2:Low-Emitting Materials
posted by  Ngo Ha  on 

Hi All,
I am currently working on 1 certified LEED project.

5
Fri Sep 1, 2023, 3:04 pm

Changing signature on LEED Agreement.

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Marine Petrosyan  on 

Hi, All!

Help, please. 

We are planning to change the representative user on LEED Online, who has signed the certification in the name of the owner.

5
Project Manager
Energy Systems LLC
LEEDuser Basic Member
0 thumbs up
Thu Aug 31, 2023, 8:12 pm