Forum quick links
Energy Modeling Procedure for a Data Center
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by Santiago Rodriguez on
We are working on a project that is seeking the LEED NC 2009 Certification.
Determining Option 1 or Option 2
CI-2009 EAc3:Measurement and Verificationposted by Michelle Rosenberger on
Our specific LEED CI project is definitely less than 75% of the building. But our client for the CI we are pursuing occupies the whole building.
Rational Method
CS-2009 SSc6.1:Stormwater Design—Quantity Controlposted by MKK LEED on
Good Morning, I’m starting with calculations in SS credit 6.1. But I have a question: Can I use the runoff data of the watershed where is located the project?
Sun Control Window Films
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Julien Lafond on
This project with large window areas is installing sun control window films which rejects 72% total solar energy and gives 66% of solar heat reduction.
HVAC Systems Selection for Baseline
CS-2009 EAc1:Optimize Energy Performanceposted by Mark Stromberg on
My question is regarding the following procedure as outlined in Trace 700 help: "To determine which ASHRAE baseline system to model, refer to ASHRAE Standard 90.1-2007, Table G3.1.1A (below).
3 Residential Tower + 1 Commercial Shop lot
posted by SW LEE on
Hi, Im confuse, on which path i should choose to register my project and it's fee. Scenario : the project has a huge parcel of land, and consist few building.
Chemical/Hazardous Gas Area Separation
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Brian Harris on
We have a project that has a garage which has storage, mechanical and other occupied spaces accessed through doors.
Electric instantaneous water heater
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by CT G on
Hi, The design team is specifying an electric instantaneous water heater on a project we are working with.
Methyl Hydrate Solvent
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Lilian Seow on
This is for cleaning pipes prior actual coating and painting application. I understand that this solvent does emit strong odor and as such application after hours is preferred.