Gerrymandered site?
posted by Lawrence Lile on
I have a LEED project that includes three buildings and a large constructed wetlands, however there is an existing building smack in the middle of them.
Tenant performance of base building improvements
CI-2009 SSc1:Site Selectionposted by Susan Di Giulio on
We have a client who is leasing two entire, adjacent buildings for 12 years. They are taking on installing high SRI roof membranes and a photovoltaic canopy system in the parking lot.
WEp1 for Multiple Building
CS-2009 WEp1:Water Use Reductionposted by Marina Andrade on
I´m working on a project that is a campus with 2 warehouses, an administrative building, a large dining room, a little auditorium and a changing room.
Bus "route" versus bus "line"
CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Accessposted by STEPHEN F OURS on
My project is served by three different bus "routes" (AT2, AT4 and AT5) that make stops that are located well within the 1/4 mile walking distance.
ASHRAE Mandatory Requirement 6.4.3.4.3
CS-2009 EAp2:Minimum Energy Performanceposted by Jorge Torres-Coto on
I have a multi-story building that has one AHU per floor taking OSA from a common vertical shaft.
Coating - SRI
CS-2009 SSc7.2:Heat Island Effect—Roofposted by SW LEE on
Is paint or coating with proper tested SRI standard can earn this credit?
Alternative Daily Cover
CI-2009 MRc2:Construction Waste Managementposted by Lawrence Lile on
We are building a maintenance facility at a landfill. It would be very easy to use excavation material as Alternative Daily Cover, as the area that uses this is very close.
Moving Compost
CI-2009 MRc2:Construction Waste Managementposted by Lawrence Lile on
Soil is generally not allowed to be included in waste diversion calculations. But what if we are moving compost?
Instantenous electric water heaters
NC-2009 EAp2:Minimum Energy Performanceposted by Adam Rustige on
Hello, The model I'm working on has instant electric water heaters, per 90.1 7.4.2 Equipment Efficiency, "Equipment not listed in Table 7.8 has no minimum performance requirements." Electr
Option #3 is added to EAc5 M&V
NC-2009 EAc5:Measurement and Verificationposted by Genko Ganev on
I would like to find out what are the requirements for achieving EAc5 - Option #3? Where can I find information to read on MPR #6? and What is :" Option 1 in Pl Form1? Thank you very much