Forum quick links
Wood deck SRI
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Vanessa Bermudez on
I am working on a project registered under LEED NC 2.2. The roof includes a wood deck and I have not been able to find the SRI for wood. Any suggestions?
Server/ Computers in Data Centre
CI-2009 EAp2:Minimum Energy Performanceposted by Anthea Ng on
We have an interior renovation of works in a datacentre aiming for LEED-CI certification. The project area is managed and owned by the same client.
Kitchen Exhaust Make-Up Air
NC-2009 IEQp1:Minimum IAQ Performanceposted by Aaron Gary on
Can the make-up air (CFM) provided for a kitchen hood exhaust system be considered as part of the total OSA CFM, in the VRP calculation?
Timing of blower door tests
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Ilana Judah on
When can the blower door test take place? Can it be done when the drywall has been completed or do the cabinetry and appliances need to be installed as well?
College campus LEED boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Jason Roberdeau on
We are working on a new residence hall which is located between two existing (non-certified) residence halls on a college campus.
Remediating to "residential (unrestricted) use"
Healthcare-v2009 SSp2:Environmental site assessmentposted by Kathy Wislocky on
Is it feasible for a LEED HC project to meet this prerequisite without being remediated to a "residential (unrestricted) use?" After speaking with our environmental consultant, this would require
Energy Performance Period - ATC Operation & Programing Problems
EBOM-2009 EAc1:Optimize Energy Performanceposted by James Doyle on
On an upcoming LEED EBOM project approaching the performance we have had lots of problems with the exclusive ATC contractor (a major international company) correcting control and programing problem
Basic learning...
Pilot-Credits WEpc17:Cooling tower water useposted by Kath Williams on
For a "non-engineer," could someone please explain what I'm hearing on the project testing this pilot credit--operator concern that cooling tower won't perform as designed and water-testing analys
Maintenance Equipment 20% BMP Use Compliance
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by Kasey Kudamik on
One question I have for documenting that 20% compliance of maintenance equipment and activities meet environmental BMPs is whether GBCI looks at the maintenance and landscaping activities as a whol
compressed air
CI-2009 EAc3:Measurement and Verificationposted by Adrienn Gelesz on
I have a manufacturing plant extension CI project were compressed air is entering the LEED space from the non-CI parts of the building. (