Health Care vs Canada New Construction 2009
NC-2009 EAc3:Enhanced Commissioningposted by Shevaun Barrie on
Hi, Does anyone know if there are any extra requirements aside from the optional BECx in LEED for HC vs Canada NC 2009? I can't see any but have been told there are more visits required.
INVOICE DOCUMENTATION, ENVIRONMENTAL MATERIALS FORM QUESTION
CI-2009 MRc4:Recycled Contentposted by Shane Tohara on
I am working on my first LEED project so I apologize for this newbie question.
How to define and justify the value of the air speed?
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Cédric Marzolf on
Hello, In first place, I apologize for my English.
Clarification for credit application
Pilot-Credits WEpc18:Appliance and process water use reductionposted by monu goyal on
hii, we are doing a LEED-CI project, in our project scope I found Dishwasher only water consuming appliance, with this can I apply for this credit and whether this will be acceptable or not??
Energy Star's energy report
NC-2009 EAc5:Measurement and Verificationposted by Soo young No on
According to EA5 Measure and verification, required 1 year of energy usage report. But in PI from 1: Minimum Program Requirement (PIf1-1), required for duration of five years. Is it under same Ener
Strange comments from a reviewer re: low emitting furn
CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seatingposted by Valerie Molinski on
The reviewer for a current project of mine did not accept (pending) the Low Emitting Furniture and made the following comments: That I did not include the systems furniture for the offices (I list
Roofing Adhesive
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Shelby Kerbel on
Is a roofing adhesive that is intended to seal the roof deck to the vapour barrier considered to be on the inboard side of the weatherproofing membrane?
Multiple Buildings
NC-2009 EAp2:Minimum Energy Performanceposted by Paula Hernandez on
Hello to everybody, I have to model multiple buildings in a field, it´s not a campus, but three of four buildings, some of which are served by the same group of chillers. As I understand, the ener
Measured rates far exceeding ASHRAE requirements
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Nelina Loiselle on
Just compared the OA rates measured at each AHU by the TAB contractor with our ASHRAE calculations.
Damper actuator for operating HVAC systems
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Katherine Ann Resurreccion on
Hi, does a damper actuator qualify as an active control? Per CIR#10242, "Active control is the control capable of sensing space occupancy and adjusting the HVAC system demand based on the changes