Forum quick links
Camp Lemonnier - Naval Base in Djibouti, Africa
NC-2009 SSc1:Site Selectionposted by Peg Manuel on
We have a dormitory project at a US Naval Installation in Djibouti, Africa.
Option 4, Case 1, Path 2: No new parking
posted by Ricardo Sá on
What do you understand for "No parking will be provided or subsidized for tenant employees."?
Multiple tram lines stops within boundary
ND-v4 SLLc3:Access to quality transitposted by Philippa Cameron on
Hi, Our site has a number of tram stops located within the boundary and 1/4 mile from new and existing buildings, but only two service lines (one circular route in both directions and one east-wes
B-Corp Certification
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Michelle DiPenti on
Does anyone know if USGBC will accept the B-Corp Certification for Option 1? Thank you!
How to claifiy a permanet no-smoking signate
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Leanne Niu on
We recently got a mid-review for IEQp2. The exterior smoking policy of the project is entirely composed of a taped-on sheet of paper.
Future Expansion
NC-2009 PIf2:Project Summary Detailsposted by Mary Kay on
We have a building under construction now for which we will pursue LEED certification.
2009 BD+C and 2009 CS on Campus site- SSc4.2
posted by Deborah Lucking on
SSc4.2 is listed as a "Campus" credit. However, we have one project that is pursuing Major Renovation, and another pursuing Core & Shell certification.
LEED ND registration questions
ND-v2009 PIf2:Project Timelineposted by Gurpreet Misra on
1. Do we have to register projects under LEED ND V4 (it being released) or projects can still be registered under LEED ND 2009? 2.
Pantry in Office Building
NC-2009 IEQp1:Minimum IAQ Performanceposted by Omar Elrawy on
Dear all, I have a Pantry zone in an office building that is conditioned spearetely by a FCU. This zone has refrigerator, coffee maker, and recycling bins.
Energy and Water Data Reporting
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Yaneth Galindo on
I registered the project in the Energy Start Portfolio website, but I realized the meter I subscribe is for more than one building, I have now water and electrical submeters and I would like to kno