Forum quick links
ZERO VISITORS
NC-v4 LTc6:Bicycle facilitiesposted by soha yamani on
I am working on a substation building with only 4 FTE and zero visitors, am i still obliged to put the 4 short term bicycle racks or only the 4 long term ones as a minimum?
Low Emitting Materials (v4) - Exterior Furniture
CI-v4 EQc2:Low emitting materialsposted by Brittany Tse on
My understanding is that LEED has an emphasis on Low Emitting Materials for items inside the weather barrier.
Calculation of baseline
Healthcare-v2009 WEc2:Water use reduction - measurement and verificationposted by Emil Andersson on
Hi. Does anyone have any experience how the baseline calculation for the M&V-plan can be established?
Threat factor of opaque materials? Skylights?
Pilot-Credits SSpc55:Bird collision deterrenceposted by Erin Holdenried on
This is just comment/question on this pilot credit. We have pursued this credit successfully for a number of industrial projects that have minimal glazing.
International projects
Homes-v4 EQc7:Low-emitting productsposted by Gustavo De las Heras Izquierdo on
Hallo,
Building Products dont meet credit requirements?
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Emily Neal on
Our project is registering under V4-CI. We are having difficulty with the MR credits where it requires 20 different products, our project doesn't have 20 products to use.
Controllability of lighting in Stadiums / Arenas
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Stacey Olson on
I'm working on a project (2009 BD&C) that includes an outdoor open air stadium, and indoor facilities that include restrooms, circulation, concessions, team locker rooms, press rooms, etc. I r
automated blinds at option 2 - greater than 3,000 lux
NC-v4 EQc7:Daylightposted by Emir Pekdemir on
Helllo, In v2009, with automated blinds we used to be exempt from the requirement of not exceeding higher lux level threshold (5,000 lux).
Mix-used building - days of operation per year
CS-2009 PIf3:Occupant and Usage Dataposted by Catharina B on
We are certifying in CS 2009 an mix-office building which is in 75% office and ca 25% apartments.
Min. 30% increase of ventilation rate - international
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Lise Dannesboe on
Hi.