Forum quick links
Excluding reuglarly occupied areas
CS-v4 EQc4:Daylightposted by Jens Apel on
I know there is a must in the rating system variations; but is there any chance in C&S to exclude areas that are defined as regularly occupied?
Monitoring and alarms
CS-v4 EQp1:Minimum indoor air quality performanceposted by Jens Apel on
For balanced constant volume 100% OA systems it is sufficient to install current transducers or similar monitoring devices.
Requirement (p). Limited sidewalk intrusions
ND-Plan-v4 NPDc1:Walkable streetsposted by Nuttanee Vongveeranonchai on
Hi all, I have a question about at-grade crossing in LEED ND V.4 Walkable Streets credit.
Efficient Refrigeration Equipment
CI-v4 EAc2:Optimize energy performanceposted by Michael Archer on
Under 'Further explanation - Exceptional Calculation method - Changes from earlier versions of ASHRAE and LEED', the CI reference guide states "All project types may count energy savings from effic
Sustainability job at Microsoft/CBRE
posted by Nadav Malin on
Hi folks,
In case you know someone who might be right for this Seattle-area gig:
How to fill out the Credit form for IEQc1 for a 100% outdoor air system that does not require OA monitoring?
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Nishank Shah on
I have a 100% OA ERU that operates constantly on an occupancy schedule. There is no Outdoor airflow monitoring device on the unit and no CO2 sensors for the densely occupied spaces.
Filtration Media MERV 9
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Celimar Fournier on
Is filtration media MERV 9 allowed during construction? This is in addition to the MERV 8 filters for the AHU's.