Forum quick links
Lead CxA Representative appointment; Delay causing concerns... Urgent solution required!
NC-v4 EAc1:Enhanced commissioningposted by Olawale Taiwo on
Background Consideration:
Does implementing MBCx remove the requirement for discrete OCx functional performance testing?
NC-v4 EAc1:Enhanced commissioningposted by Ilkka Mäkelä on
Hello,
If MBCx were to be implemented in a project, is the discrete functional performance testing and reporting part of OCx not required?
MBCx Plan as part of the Ongoing Cx Plan
NC-v4 EAc1:Enhanced commissioningposted by Francesco Passerini on
Can the MBCx Plan be presented as a part of the Ongoing Cx Plan?
Product Can Count for both EPD and Material Ingredients?
CI-v4 MRc5:Building product disclosure and optimization - material ingredientsposted by Yu Zhang on
I am working on a CI project that is going for both MRc3 and MRc5. If a product happen to have EPD and one of the certificates under Material Ingredients credit, can I count it towards the 20
Extended Producer Responsibility - Same Producer, Multiple Products
CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materialsposted by Amanda Gillen on
I have several products that are specified for my project which are from the same manufacturer. For example, the same manufacturer makes the carpet and the laminate flooring.
Sandblasted Film
Pilot-Credits SSpc55:Bird collision deterrenceposted by Lourdes Salinas on
Hi, Our offices have been following a bird collision deterrence monitoring program.
What about Site Selection?
NC-v4 IPc1:Integrative processposted by Michelle Rosenberger on
Hi Marcus, So I'm confused. LEEDuser's preamble above indicates any project can get this credit, and you're not required to implement anything just analyze.
direct-only overhead lighting
CI-v4 EQc6:Interior lightingposted by DAVE LI on
Does the grille lamp fixture T8/T5 surface mounted grille lamp fixture with holes comply with direct-only overhead lighting?
Thanks
How to choose Zone system (ERV+Separate air conditioner)
CI-v4 EQp1:Minimum indoor air quality performanceposted by JAMES CHEN on
We are currently experiencing
(1) One ERV supplies OA to one space (the air conditioner is separated).