Dimming of Site Lighting
NC-v4 EAp2:Minimum energy performanceposted by Eric Claycamp on
I'm working on certification for a higher education building. We've done many LEED certified buildings on campus under previous versions, but this is our first v4 project. As I understa
thinner
CS-v4 EQc2:Low emitting materialsposted by ilse angel on
Hi! does the use of thinner for cleaning purposes falls within the scope of this credit?
Do we have to comply with the requirements of the rule 1143?
Thanks!
Environmental Site assessment for non-school project
Schools-NC-v4 SSp2:Environmental site assessmentposted by Peter Doo on
We are doing a project involving renovation of an existing building and an addition. It is not a school but we have done the assessments to identify hazmats in the existing building.
ASHRAE 90.1.2010 and unmet hours
NC-v4 EAc2:Optimize energy performanceposted by Konstantina Kalliakoudi on
Hello to all,
I have following questions concerning ASHRAE 90.1.2010 and unmet hours:
Prevention Through Design
Healthcare-v4 INc1:Innovationposted by Katherine Zanecosky on
Hi fellow LEED Users?
Has anyone else attempted the Prevention Through Design credit? If so,
Can landscape pools be classified as Nonroof measures
NC-v4 SSc5:Heat island reductionposted by DAVE LI on
I am applying for the LEED V4 BD + C new building certification, SSc5 Heat island reduction, and there is a design landscape pool (with water storage function and rainwater recovery) around th
Attached building within the LEED boundary
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Omar Elrawy on
I have a site with existing buildings, and I will attach a new building intended for LEED certificate to the existing buildings, which aren't pursuing LEED. I need to know if that compli
Definition of Material Streams
NC-v4 MRp2:Construction and demolition waste management planningposted by Christopher Russell-King on
Hello, we are currently working on a new building under LEED V4, and we have doubts regarding what is considered a material "stream".
Universal Notification Requirements
EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Managementposted by Kristen Paradiso on
What needs to be included in a universal notification about a Tier 2 pesticide application? I've found old documentation stating a "Signal Word" needs to be included. Is this still required?