Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Master site development consideration

NC-v4 SSc4:Rainwater management
posted by  soha yamani  on 

Greetings , 

in LEED V4 there was an approach where I can use a master plan rain water management system . 

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Thu Dec 6, 2018, 2:22 pm

Greenroofs

NC-v4 SSc4:Rainwater management
posted by  Ricardo Sá  on 

Hi,

 

We are using the "Small Storm Hydrology Method" to calculate runoff volume and using the Rv based on impervious area. The questions are:

 

2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Thu Dec 6, 2018, 2:11 pm

Airport -Terminal- Runways must be included at the calculations?

NC-v4 SSc4:Rainwater management
posted by  Konstantina Kalliakoudi  on 

I have a project that is an Airport Terminal. The Leed boundary includes the runways. Concerning the Credit "Rainwater management": Do the runways participate at the calculations?

1
Thu Dec 6, 2018, 2:05 pm

Option 2: Parking under cover

NC-v4 SSc5:Heat island reduction
posted by  Konstantina Kalliakoudi  on 

Hello to all,

This credit requires the 75% of parking spaces under cover.

1. So this percents refers to parking spaces and not to parking area (m2/ft2), right?  

2
Sustainability Program Manager
Primus Design Services, LLC
LEEDuser Premium Member
40 thumbs up
Thu Dec 6, 2018, 12:06 pm

Clarification on Option 01 50% Saving - WEc1 - Water Efficient Landscaping

NC-2009 WEc1:Water Efficient Landscaping
posted by  SAMY Chamy  on 

Dear all :- 

 

 we are working in a project with 100% non potable water (On site recycling water 0 using for both Flushing fixture and Irrigation)

1
Fri Dec 7, 2018, 4:28 am

adhesive for sheet vinyl

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Deborah Lucking  on 

We have a project that requires sheet vinyl flooring that is "static dissipative and static conductive". The conductive adhesive has 56 g/L VOC.

3
Principal
Sage Design & Consulting
LEEDuser Basic Member
55 thumbs up
Wed Dec 5, 2018, 8:54 pm

theatre/music/ event room in hotel project

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Natalia Kwiecinska  on 

Hi everyone,

I am documenting a hotel project. One issue is not obvious for me, so maybe someone can help.

1
Thu Dec 6, 2018, 3:33 pm

Main Street Program as a Priority Designation

NC-v4 LTc3:High priority site
posted by  Teresa Stern  on 

Our project is located 2 blocks from the nearest historic district, but is within the Downtown area encompassed by the local Main Street Program.

2
Sustainability Program Manager
Primus Design Services, LLC
LEEDuser Premium Member
40 thumbs up
Wed Dec 5, 2018, 2:58 pm