Forum quick links
Metering Requirements
CI-v4 EAc3:Advanced energy meteringposted by Ricardo Sá on
Dear All,
We’re currently trying to certify a project with the following characteristics:
Accept preliminary construction review as final
posted by Charalampos Giannikopoulos on
After the preliminary construction review we have been awarded all prerequisites and a specific amount of points.
PCB Waste considered Hazardous Material, not to be tracked?
NC-2009 MRc2:Construction Waste Managementposted by William LaRose on
I am tracking demolition waste from several structures that were removed to make room for my current LEED project.
"closing out" procedure
posted by KIMBERLY KRAFT on
Hello all- We received our Preliminary Construction Review from USGBC for a LEED-NC 2009 project.
Hair washing sinks in a hair-salon
CI-v4 WEp1:Indoor water use reductionposted by Robin Dukelow on
Hello, I am wondering if a hair washing sink/spray valve are considered process water and excluded from the Indoor Water Use Calculator, or if they should be included. Thanks!
SMACNA guidelines
NC-v4 EQc3:Construction indoor air quality management planposted by Anushka Singh on
Is it compulsory to follow all SMACNA guidelines to achieve this credit? or you can leave out a few and still earn the credit?
what is the international standard for air filters?
NC-v4 EQc3:Construction indoor air quality management planposted by Anushka Singh on
The CEN - EN 779 for air filter performance is currently inactive?
CIAQ before occupancy change
NC-v4 EQc3:Construction indoor air quality management planposted by Anushka Singh on
Why was Construction Indoor Air Quality Management Plan - Before occupancy changed to Indoor Air quality Assessment?
Can help in earning low VOC credit?
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Anushka Singh on
If we follow all the SMACA guidelines strictly, is it possible to earn the low VOC credit as well ?
Embodied Carbon goes POOF!
posted by Conor McGuire on
What is the lag time for historical embodied carbon data catching up with real-time information as manufacturers source renewable energy?